说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 公路容量
1)  higway capacity
公路容量
2)  nominal capacity
公称容量
3)  short circuit capacity
短路容量
1.
The results show that the flicker coefficient of individual unit approaches the limited value,the flicker value and the system short circuit capacity are all the main influence factor on the wind farm capacity.
结果表明,单台机组的闪变系数接近限定值,机组的闪变值及系统短路容量的大小都是限制风电场容量的主要因素。
2.
A new method is proposed to use short circuit capacity analyzing voltage stability.
短路容量是系统电压强度的标志。
3.
Take 6kV bus-bar system as an example,the system short-circuit current and short circuit capacity have been calculated in different operation modes,which provide theory basis for the system electrical equipment correct lectotype and safe operatio
以6kV母线系统为例,计算了系统在不同运行方式下的短路电流和短路容量,为系统电气设备的正确选型和系统的安全运行提供了理论依据。
4)  road network capacity
路网容量
1.
Discrete dynamic road network capacity under adverse weather
不利天气下离散化动态交通路网容量研究
2.
It has become much important to study on city motor-vehicle possession scale suitable for the development of city road network capacity to solve its traffic problems.
给出了城市路网容量和路网服务水平的概念,建立了路网容量计算模型,得到城市路网容量约束下的城市机动车发展规模的确定方法,为城市机动车需求管理提供了理论支撑。
3.
According to the property of urban transportation land use, a conception model of transportation land use is established based on consideration of the road network capacity and traffic flow velocity.
根据城市交通用地的性质,在考虑路网容量和交通流速度的基础上,以交通用地所增加的收益最大化为目标,建立了城市交通用地的概念模型,然后对概念模型中的有关参数逐一进行标定和推算,最后利用K T条件得到了该概念模型所表示的合理的城市用地规模与交通流平均速度。
5)  road capacity
道路容量
1.
From aspects such as road capacity,over-speed of increasing in car amount,public traffic and traffic management skill,main problems and reasons of current traffic in big city are analyzed in this article,relative measures and advice are also brought forward,which has an important effect on continuous,fast and health development of China economy.
从道路容量、汽车数量增长过快、公共交通、交通管理技术等方面对当前大城市交通面临的主要问题及原因进行了分析,并提出了相应的几点措施与建议,对我国经济的持续、快速、健康发展起到了举足轻重的作用。
6)  short-circuit capacity
短路容量
1.
Under the condition of meeting the power supply requirement,the relationship is analyzed between the traction transformer capacity and voltage loss of variant parts as well as the short-circuit capacity of the power system.
在满足供电要求的情况下,计算分析了牵引变压器容量与各部分电压损失、电力系统短路容量的关系。
2.
According to the analysis of impacts of connecting wind farm with power grid on system voltage, network loss, stability and short-circuit capacity and comparative research on economy and reliability, the authors consider that it is suitable to connect this wind farm to 220 kV Guodu substation by an 110 kV transmission line.
围绕风电场接入后对系统电压、网损、稳定性和短路容量等方面的影响,从经济性、可靠性等方面进行对比研究,认为该风电场送电虢都220kV变电站,并通过l回110kV线路接入系统是适宜的。
补充资料:公称
机器性能、图纸尺寸等的规格或标准。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条