1) half-clover leaf exchange
半蝶式交汇点
2) cloverleaf interchange
四叶式交汇处;蝶式交汇处
3) semi-butterfly pass
半蝶式孔型
5) conjunction points
交汇点
1.
Inthis research,the twist of the split-spun yarn was studied by the principle of the solo-spinning and mechanical theories that have three sections (conjunction points,the fasciculus above this point,and the yarns below conjunction points).
根据缆型纺先分束后汇聚的成纱机理及理论力学原理分三个部分(交汇点、交汇点以上的纤维束部分以及交汇点以下的纱线部分)对缆型纺纱线的捻度进行探讨。
2.
The twist of the split-spun yarn was studied by the principle of the solo-spinning and mechanical theories that have three sections(conjunction points,the fasciculus above this point,and the yarns below conjunction points).
根据缆型纺先分束后汇聚的成纱机制及理论力学原理分3个部分(交汇点、交汇点以上的纤维束和交汇点以下的纱线部分)对缆型纺纱线的捻度进行探讨。
6) merge point speed
交汇点交汇速度
补充资料:闭式单点、双点压力机
| |||||||
主要参数内容 | 国际先进 | 国内先进 | 国内一般 | 国内落后 | 评定方法及说明 | ||
(一)加工精度 | 参照GB10924-89、GB10933-89、JB5200-91 | ||||||
1、滑块下平面对工作台上平面的平行度(mm) | 30%精度储备 | 20%精度储备 | 达到规定值 | 大于规定值 | |||
0.02+0.10/100×滑块下平面的被测长度 | |||||||
2、滑块行程对工作台上平面的垂直度 | 30%精度储备 | 20%精度储备 | 达到规定值 | 大于规定值 | |||
0.05+0.02/100×滑块行程长度 | |||||||
(二)结构性能 | |||||||
1、离合器、制动器接通率,当滑块行程次数≤16次/分时为70%,≤25次/分时为60%,≤45次/分时为50% | 大于规定值10% | 大于规定值 | 达到规定值 | 达不到规定值 | |||
2、液压超负荷保险装置、微调装置、吨位指示器 | 全部具有 | 全部具有 | 部分具有 | 没有 | |||
(三)噪声dB(A) | |||||||
1、公称力≤400kN | ≤85 | ≤87 | ≤88 | >88 | |||
2、公称力>400kN | ≤87 | ≤88 | ≤90 | >90 |
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条