1) time-align technique
时间调整技术
2) adjustment technology
调整技术
1.
The inclined-shaft man car is a safe facility for carry man in mine, introduces the computing method and the adjustment technology of the braking force in braking process,then compares it with the shaft mine hoisting container,which used to indicates the manufacturing,using and test for inclined-shaft man car.
斜井人车是矿山斜井运送人员的安全设备,详细地介绍煤矿斜井人车在制动过程中制动力的取值方法及调整技术,并同竖井乘人提升容器制动力的调整方法相比较,揭示其对斜井人车的制造、使用、检验起到重要的指导作用。
3) technological adaptation
技术调整
1.
The study shows that af ter mastering the basic production skills,enterprises tend to localize the prod uction of components to reduce dependence upon the developed countries;then the enterprises will focus their attention on technological adaptation to take full y use of the local resources and to satisfy local customers pr.
本文通过对中国彩电产业的深入研究,力图探讨技术调整的特点。
4) setup time
调整时间
1.
Lot-streaming in three-stage flow shop with setup times separated;
三台机器流水作业中存在不同调整时间的Lot-streaming问题
2.
For the lot-streaming problem in multi-stage flow-shop,the majority of the research in the past used to fix the number of the batches and find only the optimal batch sizes without consideration the setup time:In this paper,however,Setup time for the machines is introduced.
多台机器流水作业的 Lot-streaming问题(简称LS),以往的研究都不考虑调整时间,固定分批数,寻找最优分批大小;本文对机器引入调整时间,研究同时决定最优分批数及分批大小,并给出了相应最优算法。
3.
For the Lot-Streaming problem in a two machines flow shop, the majority of the research presented fixed the number of the sublets, or the two machines have the same setup times.
对二台机器流水作业中的Lot-Streaming问题(简称LS),以往的研究多为固定分批数寻找各批大小,或对二台机器引入相同的调整时间,寻找最优分批数及各批大小。
5) setup times
调整时间
1.
This paper deals with the order planning of single machine with multi product classes and sequence independent setup times, and proposes a mixed integer programming model to minimize the sum of earliness/tardiness penalties of orders.
针对单机多产品多订单有序独立机器调整时间的订单排产问题 ,建立了以最小化订单的提前和拖期罚值总和为优化目标的混合整数规划模型 ,分析了问题的NP -hard性和最优排序中临近批组的优化特性 ,提出一个基于过滤束搜索的拟多项式时间算法 ,算法复杂性分析和仿真结果验证了算法的有效性 。
2.
In this paper,several parallel machine scheduling problems with setup times are discussed.
本文讨论带有工件调整时间的几种平行机排序问题,分析在不同情况下的计算复杂性。
3.
To efficiently solve multi-objective flow shop scheduling problem with setup times,a new multi-objective hybrid genetic algorithm(MOHGA) was proposed.
为高效地求解带调整时间的多目标流水车间调度问题,提出了一种多目标混合遗传算法,此算法依据基于Pareto优于关系的个体排序数和密度值计算适应度,保持解的多样性,并采用非劣解并行局部搜索策略,提高算法的搜索效率。
6) set-up time
调整时间
1.
Three-machine no-wait flow shop scheduling problem with set-up time separated was studied.
研究了 3台机器调整时间可分离的无等待FlowShop调度问题 ,目标函数为极小化加权完工时间和·基于对问题的分析 ,给出了目标函数的一般表示·对某些特殊情况 ,给出了问题存在多项式最优算法的充分条件·在此条件下 ,将单机调度问题的WSPT规则应用到无等待FlowShop调度问题 ,得到了求解无等待FlowShop问题最优调度的分派规则·通过反例指出了文献中的某些错误
补充资料:时间
实际上,时间单位首先从天文观测来确定的,“1平太阳日或1天(1昼夜)”是以地球相对于太阳的自转周期为基准来计量的,一个平太阳日的1/86400为1秒;后来发现地球自转不均匀,1960年国际度量衡大会把时间基准改为以地球绕太阳公转周期,即规定为1900年地球公转周期(回归年)的1/31556925.9747为1秒;随着精确、稳定的原子钟制成,1967年国际度量衡大会规定国际单位制原子时的时间单位“秒(长)是两个超精细能级之间跃进所对应辐射9192631770个周期的持续时间”。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条