1) floor firing furnace
炉底燃烧炉
2) bottom fired heater
底烧炉
3) burning in
炉底烧结
4) Combustion furnace
燃烧炉
1.
The paper presents the engineering design and equipment selection for the after-heat recovery facilities from the aspects of process,points for drawing out the blowing-air and combustion furnace system control.
从工艺流程、吹风气引出位置、燃烧炉系统控制等方面阐述了吹风气余热回收装置的设计、选型 ,介绍了目前此装置在中小氮肥厂运行的成功经验和存在的问题 ,提出了所存在问题的解决方
2.
By means of combined processing controller with industrial control computer to automatically supervise and administer oven for pellet production the control functions included temperature control of combustion furnace top, temperature control of combustion furnace outlet, moisture control of oven outlet, and complement water control are achieved.
利用过程控制器与工业控制计算机相结合对球团烘干炉进行自动监控 ,通过充分利用过程控制器的高可靠性和工业控制计算机的灵活性 ,实现了燃烧炉炉顶温度控制、燃烧炉出口温度控制、烘干炉出口水分控制、补水控制等控制功能。
3.
4 BF of TISCO have adopted air and gas double preheating facilities with auxiliary combustion furnace, which is one of new technologies of using low calorific gas to obtain high temperature blast.
太钢 4号高炉热风炉采用带有附加燃烧炉的空、煤气双预热设施 ,是一项使用低热值煤气获得高风温的新技术 ,2 0 0 0年 11月 2 6日正式投产至今 ,一直运行良好 ,效果显著 ,风温由原来的 10 2 0℃左右提高到115 0~ 1170℃ ,为使用 10 0 %的低热值 (30 0 0 k J/ m3左右 )的高炉煤气达到 12 0 0℃左右的风温开辟了一条新
5) burning furnace
燃烧炉
1.
Tube bundle heat exchanger is adopted for adjunctive burning furnace using supplemented BFG as fuel.
介绍了梅山2号高炉(1 280 m3)引进奥钢联的改进型内燃式热风炉技术;论述了其主要结构特点和设计参数;分析了其采用附加高炉煤气为燃料的燃烧炉管束式换热器的运行情况。
2.
Burning furnace is one key equipment of AHF unit, it supplys heat energy for the turning furnace.
燃烧炉是无水氟化氢装置的关键设备,它为转炉提供热源。
6) main burning furnace
主燃烧炉
1.
Design of main burning furnace and tail gas incinerator are reviewed with a 70 kt/a sulphur recovery unit as an example.
以某70 kt/a硫磺回收装置为例,仅对主燃烧炉和尾气焚烧炉的设计作一回顾,着重介绍设备结构、设计特点、材质选择及耐火衬里的施工要点等。
补充资料:炉底
1.冶炼银铅的一种脚料。见明李时珍《本草纲目.金石一.密陀僧》。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条