说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 活动强力垫板
1)  floating strong back
活动强力垫板
2)  moving bed
活动垫板
3)  hyperergasia [,haipərə'ɡeisiə]
活动力过强
4)  plate reinforced
垫板加强
1.
Static tests on a tubular N-joint (JD-A), a plate reinforced tubular N-joint(JD-B), a tubular N-joint with concrete filled in chord (JD-C) and a tubular N-joint reinforced by both concrete and plate(JD-D) under the axial compression of brace and chord were carried out.
对承受支管轴力和主管轴力的N型圆钢管相贯节点(JD-A)、垫板加强节点(JD-B)、主管填充混凝土节点(JD-C)、主管填充混凝土和垫板加强节点(JD-D)试件进行了静力试验。
2.
An experimental study was carried out on a tubular N-joint,a plate reinforced tubular N-joint,a concrete filled tubular N-joint,and a N-joint reinforced by concrete and plate under the axial compression of brace and chord.
对承受支管轴力和主管轴力的N型圆钢管相贯节点、垫板加强节点、主管填充混凝土节点、主管填充混凝土和垫板加强节点试件进行了试验研究。
3.
Experiments on static behavior of a tubular N-joint(JD-A),a plate reinforced tubular N-joint(JD-B), a concrete filled tubular N-joint(JD-C) and a N-joint reinforced both by concrete and plate(JD-D) under the axial compressive stress on brace and chord were carried out.
对承受支管轴力和主管轴力的N型圆钢管相贯节点(JD-A),垫板加强节点(JD-B),主管填充混凝土节点(JD-C),主管填充混凝土和垫板加强节点(JD-D)试件进行了极限承载力试验。
5)  reinforcement pad
补强垫板
6)  Saddle top plate
加强垫板
补充资料:凹模壁厚及凹模垫板尺寸

型腔壁部投影面积            壁            厚,        毫          米
F, 厘米2              h1           h2         h3          h4         h5 
<5                   15~20        30~40      <=10        15~20      30~40
>5~10                20~25        40~50      10~15       20~25      40~55
>10~50               20~30        50~60      15~20       20~30      55~65
>50~100              30~35        60~75      20~25       30~40      65~70
>100~200             35~40        75~85      25~30       40~50      70~75
>200                  >40          >85       30~35       50~60       >80


说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条