1) specific speed of water turbine
水轮机比转数
2) turbine runner
水轮机转轮
1.
The cavitation-resistance puddle welding technique for turbine runner treatment and its benefit analysis;
水轮机转轮抗气蚀堆焊工艺及效益分析
2.
Aimed at a capacity-enlarging remodeling of the turbine runner of hydropower station in Xinjiang and based on the application of 3-D turbulent flow computation with k-ε model, the governing equations of turbulent flow in body -fitted coordinate systems for Francis turbine runner are presented.
针对新疆某电站水轮机转轮增容改造 ,基于 k-ε模型的全三维湍流计算技术在流动计算中的应用 ,给出了混流式转轮在贴体坐标系下的湍流计算的基本方程组 。
3.
The turbine runner of Bailong hydropower station was damaged in the fifth year of production,which caused the excessive amplitude of vibration and served no good for effective production.
百龙电站水轮机转轮投产不足5年就严重损坏,致使发电机组振动幅度大增,效率明显下降。
3) hydraulic turbine runner
水轮机转轮
1.
Computer simulation of turbulent flow through a Francis hydraulic turbine runner;
混流式水轮机转轮紊流流场的计算机仿真
2.
TBM-6 type blade shape measure Instrument for hydraulic turbine runner and its application were introduced in this paper.
本文介绍了TBM-6型水轮机转轮叶型测绘仪及其应用情况。
3.
The necessity and feasibility of redesign of hydraulic turbine runners in middle small sized hydropower stations are analyzed.
中小型水电站技术改造是水电事业发展的重要组成部分 ,本文通过对我国中小型水电站发展现状的论述 ,分析了在中小型水电站技术改造中水轮机转轮改型设计的必要性和可行性 ,并介绍了当前水轮机转轮设计、测试和制造方面的新技术。
4) hydraulic turbine
水轮机转轮
1.
Based on the compare of various traditional procedures,and with theory research and practice,the article put for wad a viewpoint and a procedure that the crack fixing of hydraulic turbine can be done without heat treat-ment in ex amine and repair of hydraulic plant.
通过对水轮机转轮裂纹修复几种传统工艺比较分析,针对水电厂检修特点提出了可采用不热处理进行修复的观点,并在理论研究和实际应用的基础上,较系统地提出了一套转轮裂纹修复工艺措施。
5) hydroturbine runner
水轮机转轮
1.
Experiment research on residual stress distribution in welding zons of large hydroturbine runners before and after anneal
大型水轮机转轮焊接区退火前后残余应力分布规律的实验研究
2.
The Longtan runners are the earliest super-large hydroturbine runners manufactured in construction site in China.
龙滩水电站水轮机转轮是国内最早在工地制造的大型水轮机转轮之一,文章详细介绍了龙滩转轮工地制造的质量标准、制造检验及验收程序,并对龙滩已交货的转轮主要质量指标以及整体质量进行评价,最后对工地制造转轮提出合理建议,对大型转轮工地制造及检验有一定指导和借鉴意义。
6) a pump-turbine runner
水泵水轮机转轮
补充资料:冲击式水轮机
冲击式水轮机
impulse turbine;Pelton turbine
转轮结构比较简单,多用于中小型水电站。 ┌───┬─┐ │尸 │门│ ┌─┼───┼─┼─┬─┬─┬─┬──┐│ │广尸 │口│目│哟│l │口│划l ││ │l夕习 │ │ │ │ │ │ │└─┴───┴─┴─┴─┼─┼─┼──┘ │】│困│ └─┴─┘ 图1水斗式水轮机结构图1一输水管;2一喷嘴;3喷针;4转轮;5折向器 双击式水轮机水流向心地射向转轮并充满部分叶片的流道后,再离心地射到另一部分叶片上,前者利用70%~80%的动能,后者利用动能的20%一30%。由于水流两次冲击到叶片上.因而称为双击式水轮机,如图4所不。 发展简史及趋势1880年,美国人L.A.佩尔顿“.A.图2水斗式水轮机 转轮结构图Pelton)首次提出一种双曲面型水斗式水轮机,经不断改进,成为现代的型式,亦称为佩尔顿式水轮机。 图3斜击式水轮机射流斜击转轮示意图 随着水轮机技术的进步.冲击式水轮机的应用11益广泛。其使用的水头已达l000m以L.喷嘴的数量也随之增加,大型水斗式水轮机的喷嘴数已达6个之多。发展趋势是提高单个喷嘴的比转速和继续增加喷嘴的数量,以适应更高水头电站的需要。使用大型水斗式水轮机最多的是欧洲,如娜威的西西马(Sysima)水电站的水斗式水轮机,单机额定功率为315 MW,电站水头885m,转轮直径5.lm,立轴,6个喷嘴。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条