说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 桥梁吊挂装配
1)  balanced erection
桥梁吊挂装配
2)  balanced erection
吊挂装配
3)  bridge hoisting
桥梁吊装
4)  hoisting of deck beam
桥面梁吊装
5)  assembling type girder bridge
装配式梁桥
6)  Prefabricated bridge
装配式桥梁
1.
The main problem of the mode synthesis method, applied in structural vibration analysis of prefabricated bridges, is how to select relevant number of low frequency modes synthesized during the course that displacements of substructures are expressed in generalized coordinates that are defined by displacement modes.
模态综合法应用于装配式桥梁结构振动分析的主要问题 ,是在将子结构坐标缩聚为模态广义坐标的过程中 ,如何选取适当数目的低阶模态来参与综合。
2.
The method for restrained mode synthesis applied in the dynamic analysis of prefabricated bridges is presented in this paper,so that the low frequencies and the intrinsic modes of prefabricated bridges can be calculated.
将约束模态综合法应用到装配式桥梁的振动分析中 ,介绍了如何计算该结构的低频及其固有模态。
补充资料:厂房钢结构组合吊装


厂房钢结构组合吊装
combined hoisting of steel structure for workshop building

  采用组合吊装时,要结合结构型式,根据起重设备能力,保证安全、质量,提高作业效率的原则确定构件组合的范围。常用的组合形式有:(l)多节柱的组合,对H形框架结构也可采用柱与梁组合;(2)吊车梁与辅助析架的组合,将吊车梁、辅助析架利用制动板、水平支撑、垂直支撑进行固定,形成组合体;(3)天窗架的组合,将垂直天窗架与屋面、墙面擦条、天沟和支撑等进行组合;(4)墙面系统的组合,以墙皮柱作骨架,将其与墙面镶条、拉条和钢窗等组合在一起.(5)厂房屋面系统整体组合吊装,将2~3棍屋架,与屋架间上下弦的水平支撑、垂直支撑、屋面镶梁、天沟及天窗等全部构件组合成整体进行吊装。 组合吊装一般选用大型塔式起重机或履带式起重机。吊装前要对起重设备和组合构件进行验算,包括:(1)起重机的起重能力(包括起重量、回转半径、起重高度等)复核;(2)组合件整体稳定和局部稳定验算;(3)吊点处局部变形验算和吊点距离计算;(4)提升用绳索和吊具验算。验算结果全部符合技术要求后,方可进行吊装。 (刘庆华)ehangfang gang」旧gou zuhe dlaozhuang厂房钢结构组合吊装(eombined hoisting ofsteel strueture for workshop building)将部分单体构件预先在地面上组拼成整体后,用起重设备提升到设计位置上的作业。这种方法比单体吊装可大量减少高空作业,节省大型起重设备的台班费用,有利于保证结构节点的焊接质量。但施工准备时间较长,结构组合几何精度控制较复杂,并需选用有较大提升能力的起重设备。
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条