说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 粗选沉淀池
1)  roughing sediment bowl
粗选沉淀池
2)  settling tank
沉淀池
1.
Simulation and control of sludge blanket height in settling tanks;
沉淀池污泥层高度的模拟与控制
2.
Reynolds number of water flow in horizontal flow settling tank is above 3 000,and it is called turbulent flow.
平流式沉淀池内水流的雷诺数>3 000(为紊流),当利用传统的层流模型进行模拟时不能准确获得沉淀池内的流速场分布,若采用特征涡粘性雷诺数或密布网格,则可以扩展层流模型模拟沉淀池内物理量的适用性。
3.
The settling tank cost model is established by using it.
运用BP网络的非线性函数逼近功能,以沉淀池的计算表面积与计算体积为网络的输入,沉淀池的费用值为网络的输出,建立单体构筑物沉淀池的费用模型。
3)  Settler [英]['setlə(r)]  [美]['sɛtlɚ]
沉淀池
1.
Settling mechanism and influencing factors on matte droplets in settler slag of copper flash smelting furnace;
铜闪速炉沉淀池渣中锍液滴沉降机理及其影响因素
2.
To counter the problems in discharge of sludge from settlers, a new type perforated pipe with divergent tube is developed.
针对沉淀池排泥过程中所存在的问题 ,研制了一种新型的排泥装置———扩张管嘴排泥管。
3.
A one-dimensional(1D) layered and hydraulic settler model with Takács settling velocity model was constructed by the incorporation of dispersion item and density current.
通过在沉淀池一维分层模型中纳入弥散项和异重流,建立沉淀池一维分层水力模型,并选用Takács模型描述沉淀池中悬浮固体的沉降速率。
4)  sedimentation tank
沉淀池
1.
Numerical modeling on the movement of water and SS in two-dimensional sedimentation tanks of sewage factory.;
污水厂二维沉淀池水流和悬浮物运动数值模拟
2.
The design of PLC-based autocontrol system applicable to sludge water dischargers for sedimentation tanks in waterworks;
自来水厂沉淀池排泥装置PLC自控系统设计
3.
Practice to reduce the turbidity of outlet water by increasing the length of sedimentation tank catch basin;
加长沉淀池集水槽降低出水浊度的实践
5)  Sedimentation basin
沉淀池
1.
Improvement of sedimentation effect by laying of short-tube filling in sedimentation basins;
短管填料对沉淀池沉淀效果的改进
2.
In this article, authors introduce construction methods of a 50m diameter sedimentation basin and the new two-time tension technique adopted to prestressed wall concrete, and provide experiences to avoiding temperature and shrinking cracks on walls which can be referred to construction of similar preedstressed projects.
介绍了50m直径沉淀池施工工艺和池壁预应力混凝土采用二次张拉新技术,为防止施工过程中池壁产生温度和收缩裂缝提供了经验,可供同类型预应力工程施工参考。
6)  precipitating tank
沉淀池
1.
Design and approach on sump and precipitating tank upward and downward mining area;
上下山开采采区下部水仓及沉淀池设计探讨
2.
During manufacturing in cogging workshop,it produces a lot of oxide filing, these filings get into precipitating tank through the channel.
开坯车间生产过程中产生大量氧化铁皮,这些铁皮通过冲渣沟进入沉淀池。
补充资料:粗选


粗选
roughing

CUXU0n粗选(r oughing)对入选原矿进行初步分选的作业或过程。原矿经过粗选,被分为粗精矿(或混合精矿)、中矿和尾矿等两种或两种以上的产物。粗选精矿或混合精矿一般需进行精选富集或进一步分离,才能得到合格精矿。粗选可以由一个分选作业来完成,其作业精矿或尾矿,一般需进行精选或扫选;也可以由若干分选作业组成的粗选段或粗选厂来完成。 (王士源)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条