1) The logs jammed in the river.
圆木挤塞在河里。
2) The logs jammed in the fiver.
河里挤满了原木。
3) Tarim River
塔里木河
1.
Influence of Wasteland Development on Tarim River Quality and Primary Countermeasure——A Case Study from Alar Hydrometric Station;
土地开发影响下的内陆河流水质演变研究——以塔里木河干流区上游为例
2.
Effects of Emergent Water Project on vegetation coverage in the lower reaches of Tarim River;
应急输水工程对塔里木河下游地区植被覆盖度的影响
3.
Local Resident's Response to Ecological Water Re-inflowing into Lower Reaches of Tarim River;
当地居民对塔里木河下游应急输水响应分析
4) the Tarim River
塔里木河
1.
Impact-post Assessment of Ecological-based Emergent Water Conveyance Project at Downstream the Tarim River;
塔里木河下游生态应急输水工程影响后评价内容探讨
2.
Water Quality Assessment and Ecological Security Research in Main Stream of the Tarim River;
塔里木河干流水质评价及生态安全性研究
3.
Monitoring and assessment of emergent water transportation and ecological improvement in the lower reaches of the Tarim River;
塔里木河下游应急输水与生态改善监测评估
5) Tarim River Basin
塔里木河
1.
The Driving Forces of Environmental Change during the Last 50 Years in the Tarim River Basin;
塔里木河流域近50年来生态环境变化的驱动力分析
2.
The Dynamic Variation of Water Resources and Its Tendency in Tarim River Basin;
塔里木河流域水资源变化的特点与趋势
3.
The design and establishment process on remote sensing Image database in Tarim River basin;
塔里木河流域遥感影像数据库系统的设计和建立
6) Muli River
木里河
1.
Changes of Aves Diversity of the Muli River Valley and the Shuiluo River Valley in Sichuan;
四川木里河和水洛河流域鸟类物种多样性的变化
2.
The deformation reason can be confirmed as the results of concentrated drainage of valve chamber traffic tunnel by analyzing 3D monitoring data of the slope deformation body surface behind Shawan hydropower house in Muli River.
通过对木里河沙湾水电站厂房后边坡变形体的地表三维监测资料的分析,可以判断其变形是由于阀室交通洞的集中排水造成的,由于厂房边坡开挖、S216省道改线和雨季降水入渗等因素的共同作用,进一步加剧了边坡的变形。
补充资料:圆木
1.指"圆木警枕"。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条