说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 延迟开发井
1)  delayed development well
延迟开发井
2)  delayed development
延迟开发
3)  delay [英][dɪ'leɪ]  [美][dɪ'le]
迟发,迟延
4)  delayed cementing
延迟固井
1.
Restoring damaged old wells by using delayed cementing technique of φ101.6mm casing;
用φ101.6mm套管延迟固井技术修复残坏老井
2.
6 casing delayed cementing technology was carried out.
6无接箍套管、套管扶正器,并应用了延迟固井工艺,确保了φ101。
5)  shut-in lag
延迟关井
1.
Obtaining the rate of delay shut-in period is the key factor of shut-in lag modification technology.
油气井的延迟关井现象严重歪曲了试井解释结果。
6)  delayed fracture
延迟开裂
1.
The conclusion that martensite and its tempering structure have more sensibility is obtained through sensibility test of high strength bolt delayed fracture under the conditions of different materials,different heat treatment pro.
延迟开裂是高强度螺栓等汽车零件重要失效形式之一,具有广泛性和多发性,有效地控制和防范延迟开裂的发生,在工程上有着非常重要的意义和技术指导性。
补充资料:固井


固井
sealing of drop-shaft bottom to rock

  gUJ,ng固井(sealing of drop一shaft bottom to roek)在竖井沉井法掘进中将沉井井筒永久固定的技术。当沉井下沉达到设计深度后,为防止井筒继续下沉或出现位移,需采取加强井壁和土帮的固定措施,以隔离井筒与井外含水层的水力联系,这是沉井施工的最后一道工序。固井采取的主要措施是联接套井与沉井的上口,井筒壁后注浆以增加侧面阻力,砌筑沉井基座以增加正面阻力,最终使井筒保持稳固。 在固井之前,若刃脚坐落的基岩上面无隔水粘土层,则需构筑封底止水垫,以防止井内排水后,发生涌砂冒泥或突水事故。封底后,首先要清除套井与沉井之间的泥浆,然后在其中浇灌片石混凝土,同时将沉井上口的钢筋与套井锁口的钢筋焊接好,并浇灌混凝土,使沉井与套井连成整体。最后,排除井内积水,进行壁后注浆。一般采用分段下行、分段内上行式注浆方法。当采用泥浆护壁减阻时,要先注清水,把泥浆置换出来后,再注水泥浆。井底筑有止水垫时,要进行工作面预注浆。待浆液凝固后,破除封底止水垫,在基岩中砌筑沉井基座。待基座砌好,沉井施工结束,即转入井筒普通法掘进。 (石达民)
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条