1) anchorage fixing
锚固安装
2) installation of anchor fix bolt
锚固螺栓的安装
3) anchor device
锚固装置
4) anchorage installation
锚具安装
1.
The following paper illustrates pre-stressed tensioning technique from stretching apparatus,tensioning control,tensioning operation,stretching order,tensioning procedure,anchorage installation and safety problem,and discusses the control of pre-stress loss in the stage of tension,in order to ensure the construction quality of pre-stressed concrete beam slab.
从张拉设备、张拉控制、张拉操作、张拉顺序、张拉程序、锚具安装及其安全问题等方面对预应力张拉技术进行了详细阐述,并对张拉阶段预应力的损失控制进行了论述,以保证预应力混凝土梁(板)的施工质量。
5) installation of tie rod
锚杆安装
1.
Construction methods, quality requirements and quality control for installation of tie rods in anchorage blocks of Shantou Bay Suspension Bridge, and technology of production and casting of large volume concrete for the blocks are presented.
介绍了汕头海湾大桥锚碇工程中的锚杆安装施工方法、质量要求和控制,以及锚碇大体积混凝土的生产与灌
6) anchor chain installation
锚链安装
补充资料:锚固
锚固
anchor
mO0gU锚固(a nchor)采用锚杆或锚索对边坡进行加固的作业。在边坡上钻孔穿过潜在滑面,插人锚杆或锚索,在锚固端注浆后对锚杆(索)预加拉应力,最后在坡面上锁紧锚头。其作用原理是借助锚固段砂浆与孔壁周围岩体的摩擦阻力,将锚杆(索)的应力传递到潜在滑动面以下的深部岩体中,增高滑体对滑面上的正应力,从而提高抗滑阻力,使锚杆(索)锚固端两端部之间形成压力锥体范围内的岩石被挤压,进而使潜在滑动面上下的岩石与锚杆(索)联成一个整体,形成一均匀挤压带,约束了岩体的变形和破坏,提高了坡体的稳定性。其作用原理见图l。 对于平面型滑坡锚杆(索)加固作用(图2)以公式表达: 加固前K,一昼塑竺决李型兰卫二 。。二n:‘”Gsin口 二.二。。_[Geosa+Psin(a+6)〕tan笋+CL 加固后K:二匕=共一舟井拱子拼井罕拱裂止二 ““目,“一’‘Gsinq一尸cos(口十6)式中分子表示抗滑力;分母表示滑动力;Kl、K:分别为加固前后边坡稳定性系数;G为滑坡体重量四为滑动面倾角;0为预应力锚杆(索)与水平面的夹角;尹为岩石的内摩擦角;C为岩石粘结力;L为条块滑面长度;尸为锚杆〔索)每沿米的预拉力。 预应力锚杆(索)主要适用于岩体整体性较好且具有确定的潜在滑动面的岩质边坡。笋 图1锚杆(索)作用原理示意图 王一压缩带;2一猫杆(索);3一未加固的表面岩石; 4一锚头;5一滑动面;6一锚固段 、尸少汀 G 图2锚固力尸的作用图
说明:补充资料仅用于学习参考,请勿用于其它任何用途。