说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 肘板趾
1)  toe of bracket
肘板趾
2)  toe slab
趾板
1.
Experimental research on grouting soft rock foundation under toe slab of Siping concrete faced rockfill dam;
寺坪面板堆石坝趾板软岩基础灌浆试验研究
2.
When the diversion tunnel hasn t yet satisfied the essential conditions of water diversion,the impervious cut-off in foundation of toe slab of Laodukou CFRD is constructed with sectionalized cofferdams to block up the river channel by stages;the details are described.
介绍了老渡口水电站面板坝的趾板基础防渗墙,在导流洞尚不具备过流条件下,采用左、右两段围堰分期导流施工的措施。
3.
Two types of joints,the rigid joint and the flexible joint,between toe slab and foundation of the concrete-faced rockfill dam(CFRD) of the Nalan Hydropower Power Station are analyzed by 3D elastoplastic finite element method.
采用三维弹塑性有限元分析,对那兰水电站混凝土面板堆石坝趾板与基础的两种连接方式——刚性连接与柔性连接进行了比选及技术论证。
3)  plinth [英][plɪnθ]  [美][plɪnθ]
趾板
1.
Mix proportion test of plinth concrete and its quality control for Meidai reservoir in Inner Mongolia;
内蒙美岱水库趾板混凝土配合比试验及质量控制
2.
Design of the plinth of Shuibuya CFRD Dam;
水布垭面板堆石坝趾板设计
4)  toe-slab
趾板
1.
The foundation rock under toe-slab has complicated lithological condition,and the rock masses are soft layers alternating with hard layers.
清江水布垭面板坝坝高233m,为目前世界最高面板坝,其趾板建基岩体软硬相间,岩性复杂,如何从经济和工程安全两方面,确定建基岩体利用和验收标准值得研究。
2.
The measures and technical specification used for testing quality of base rock under the left toe-slab of Shuibuya dam are described in detail, based on the analysis of test data, a comprehensive assessment for the quality of base rock is given.
对水布垭大坝左趾板建基面岩体质量检测设计、方法和技术要求进行了详细的介绍 ,并对检测结果作了分析 ,同时对趾板建基面岩体质量进行综合评
5)  toggle plate
肘板
1.
The broken problem of back toggle plate often happens when PEJ1215 simple pendulum jaw crusher is operated on site.
因PEJ1215简摆颚式破碎机在现场使用时多次出现后肘板断裂问题,本文通过对后肘板进行静强度和疲劳强度分析,得出比较合理的改进方案,从而预防了肘板断裂问题。
6)  bracket panel
肘板缘板
补充资料:小趾次趾
小趾次趾 小趾次趾   人体部位名。即足第四趾。又称次小趾。《灵枢·经筋》:“足少阳之筋,起于小趾次趾,上结外踝。”
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条