说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 上层平台
1)  upper platform
上层平台
2)  topsides installation vessel
平台上层安装船
3)  offshore platform
海上平台
1.
Harmonic analysis of offshore platform power system based on ETAP power station;
基于ETAP PowerStation的海上平台电力系统谐波分析
2.
Model of multi-level fuzzy optimum lectotype of offshore platform;
多级工程模糊优选在海上平台设计选型中应用
3.
Programming design of fatigue and fatigue reliability analysis for offshore platform structures;
海上平台结构疲劳与疲劳可靠性分析程序设计
4)  top head platform
上盖平台
1.
This article discussed some questions in the structural design of the vehicles segment top head platform.
本文探讨了车辆段上盖平台在结构设计中应注意的问题。
5)  Online Platform
网上平台
6)  offshore platforms
海上平台
1.
About the pollution control of the offshore platforms;
论海上平台的防污染管理
2.
5 m,the water depth 42 m,such as the design and construction of offshore platforms additional anchorage,steel pipe piles and steel tube measurement positioning using by forward intersection method,using seabed mud as a drilling mud preventing hole collapse,steel reinforcement cage strengthening by Z-shaped steel and hoisti.
为此采取在深水钻孔灌注桩施工中增加锚碇的海上平台,前方交会测量定位插打钢管桩和钢护筒,利用海底淤泥作为钻孔泥浆防塌孔,钢筋笼采用Z形加固和一主三辅吊点吊装,水下混凝土灌注等措施,成功解决了风和潮汐作用下的大直径深水桩的施工难题。
3.
Committee for offshore platforms outside maintenance project management and management of progress in cos
针对海上平台外委维修项目管理中进度管理和费用管理不能有效结合以及信息不够及时准确的缺陷,从项目进度与费用联合控制原理的研究出发,对进度一费用联合控制的理论基础进行了深入的研究,并将研究重点放在项目实施过程中的实时跟踪以及偏差分析上,进而提出将外委项目管理与资产管理有效集成并信息化的一种有效的管理方法,在目前业界领先的资产管理软件(MAXIMO)的基础上开发了外委维修项目的费用进度综合控制模型,并实例验证了此模型的可行性和科学性。
补充资料:海上平台
海上平台
offshore platform
    高出海面且具有水平台面的一种桁架构筑物  。供进行生产作业或其他活动用。有固定式平台和浮式平台两类。①固定式平台。有桩式、绷绳式和重力式等。桩式平台由承台和桩基构成。桩基有木桩、钢桩和钢筋混凝土桩等种,构筑时将它打入海底,其上安装了承台。绷绳式平台又称系索塔平台,将一个预制的钢塔安放在海底基础块之上,用钢索沿不同方向锚定拉紧而成。重力式平台是靠平台自身的重量稳坐在海底坚实土层之上的,抵御风暴及波浪袭击的能力强。②浮式平台。有可迁移的和不迁移的两种。可迁移的浮式平台又称活动平台,有坐底式、自升式、半潜式和船式等4种,多用于海底石油和天然气的钻探。不迁移的浮式平台常建于靠近岸边或海况较好的海域,常用普通的驳船结构,系泊采用锚定法,先用于开采海底石油,后用于建造海上浮式工厂和浮式贮库等。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条