1) NTSA Network Technical Support Alliance
网络技术支持联盟
2) technical supporting network
技术支持网络
1.
Because of the strong technical supporting network of the system,the installation,debugging and the technical support of the vehicle tracing system become fast and complete.
由于本系统拥有强有力的技术支持网络,使得车辆跟踪系统的安装调试和技术支持变得快捷、完善。
4) TSA Technical Support Association
技术支持同盟
5) the Advocacy Coalition Framework
支持联盟
1.
A Study on National University Corporation in Japan:An Analysis Based on the Advocacy Coalition Framework
日本国立大学法人化的政策变迁研究——基于支持联盟框架的分析
6) extended enterprise
网络联盟
1.
Production planning and scheduling in manufacturing cell for the extended enterprise;
网络联盟企业中制造单元的作业计划与调度
2.
Research on the KeyTechnology of Production Management and ASP Platform in the Extended Enterprise;
网络联盟企业生产管理关键技术及ASP支持平台研究
3.
Based on the study of need of manufacturing extended enterprise,the ASP-Based extended enterprise is shown to be the effective approach to tackle some problems for the small and medium enterprises(SME).
在分析了制造网络联盟企业发展的必要性的基础上,说明了基于ASP模式的网络联盟企业是中小制造企业解决各种矛盾的一个有效途径,研究了基于ASP模式的支持平台的体系结构、运营模式,并分析了构建服务平台的使能技术:组件和XML技术的应用、用户权限管理、分布式协同及其工具的使用、基于工作流和分布式资源的管理技术。
补充资料:网络技术
网络技术 network techniques 研究网络一般规律和计算方法的技术。又称统筹法。网络技术是用网络图的形式把一项任务的有关活动有机地组成一个整体,并通过分析和计算求得最优化效果的技术。是一种编制工程速度计划,并对计划实行科学管理的有效方法。网络技术的基础是网络图,基本方法是先编制网络图,再利用网络图优化工程计划。 网络图是由工序(箭)、节点(圆圈)、线路、时间参数和时间坐标四大部分构成的。工序指工程中的备料等工艺程序;节点是一种表示工程开始、结束或工序分界的符号,通常用圆圈内标上数码编号表示,如①②等;线路是按顺序或逻辑关系连结起来的工序所组织的道路,通常用双实线或粗实线表示;时间参数分工序工时和节点参数两种,前者指该工序从开工到完工所耗时间,一般用数目字标注在工序下方;节点参数包括节点、节早和节迟,节早指最早能够开工时间。节迟指最迟必须开工时间;时间坐标分累积日期坐标和日历日期坐标,一般置于网络图的上方或下方。 编制网络图的步骤:①分解工程。②列出工序清单。③画出草图。④计算网络时间并标上草图。⑤找出关键线路(消耗时间最长、决定工程总工期的线路)、算出总工期。⑥调整布局配置时间坐标。 调整和优化网络计划的根本途径可以归纳为:向关键线路要时间,向非关键线路要资源。 |
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条