1) preconstruction stage
施工前阶段
2) construction stage
施工阶段
1.
How to do well the supervision work in the engineering construction stage;
浅析如何做好工程施工阶段的监理工作
2.
Engineering cost control in the construction stage of the construction project;
建设项目施工阶段工程造价控制
3.
Discussion on the project cost control in construction stage;
浅谈施工阶段项目的成本控制
3) construction phase
施工阶段
1.
Reorganizing method of engineering supervision data in construction phase;
谈施工阶段工程监理资料的整编方法
2.
Analysis on effective cost control measures in design and construction phases;
浅析设计和施工阶段造价的有效控制
3.
Study on announcement system at construction phase;
浅议工程施工阶段的公示制度
4) constructing stage
施工阶段
1.
Research on the cost management of constructing stage in construction project;
浅谈项目施工阶段的造价控制
2.
Discussion on cost management of constructing stage in construction project;
谈建筑工程施工阶段的造价管理
3.
Cost control of constructing stage during construction items executing process;
浅谈建设项目实施过程中施工阶段造价控制
5) construction period
施工阶段
1.
Supervision on investment control in construction period of Xiaowan hydropower project
小湾水电站施工阶段监理投资控制工作
2.
Stress monitoring analysis in the construction period of the continuous beam bridge cantilever
连续梁桥悬臂施工阶段的应力监测分析
3.
The top emphasis of the project cost control should be placed on internal management, especially on the effective control of the direct cost and construction period.
工程成本控制主要是放在内部管理上,特别是直接工程费和工期的有效控制,其次外部的市场因素和施工阶段的变更索赔也是着重考虑的一个方面。
6) construction
[英][kən'strʌkʃn] [美][kən'strʌkʃən]
施工阶段
1.
Based on the experience of gravity type hathpace stracture cracks prevention and care, the paper summaries the way that check calculation of construction defects, discusses the prevention and care method of cracks, The results of this paper have guilding value for similar projects.
本文结合重力式高台结构开裂病害防治的施工实践,总结了通过结构常规的施工阶段验算来发现结构薄弱点的方法,并论述了解决重力式高台在施工过程中开裂的病害防治方法。
2.
Its structural response such as displacement and stress in beam and pylon, tension in cable on the bridge under dead loads, vehicle load and temperature action during its construction and service stages has been measured.
以武汉市江汉四桥(主跨232m的独塔双索面预应力混凝土斜拉桥)为例,对混凝土斜拉桥在施工阶段和使用阶段由荷载及温度作用所导致的结构反应进行了现场检测,对结构中的几何非线性影响进行了比较详尽的分析。
3.
According to the experiences of construction management,this article introduces the basis?flow chart and measures of water conservancy engineering construction expenses monitoring.
水利是国民经济的命脉 ,本文结合作者在施工现场管理工作的体会和经验 ,提出了水利工程施工阶段造价控制的依据、控制流程图和应采取的一些措施 ,并通过实例对其进行了详尽的论述 ,对工程造价管理人员有一定的借鉴作
补充资料:施工企业技术组织措施计划(见施工企业技术)
施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise
施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条