1) carabela
克拉布拉
2) Qingbulake
菁布拉克
1.
Shrimp zircon U-Pb dating of diorite from Qingbulake basic complex in western Tianshan Mountains of Xinjiang and its geological significance;
新疆西天山菁布拉克基性杂岩体闪长岩锆石SHRI MP定年及其地质意义
2.
Geochemistry of the Qingbulake Basic Complex in Western Tianshan;
西天山菁布拉克基性杂岩体的地球化学特征
3) Bulac cotton
布拉克棉
4) Georges Braque (1882~1963)
布拉克,G.
5) Qiongbulake
穷布拉克
1.
Analysis of geological feature and ore-controlling condition of Qiongbulake copper deposit in west Alulale region,Xinjiang
新疆阿吾拉勒西段穷布拉克铜矿地质特征及控矿条件分析
6) Wulunbulake
乌伦布拉克
1.
Geologic and Geophysical Features of Wulunbulake Copper-Molybdenum Mine and its Exploration;
乌伦布拉克铜钼矿床地质地球物理特征及扩大找矿前景
2.
This paper briefly reviews the integrated application of magnetic method,transient electromagnetic method and induced polarization method in exploration of Xinjiang Wulunbulake copper mine.
本文简述了磁法、瞬变电磁法和激发极化法等综合物探方法在新疆乌伦布拉克铜矿区勘探中的综合应用。
补充资料:布拉茨克水库
布拉茨克水库 Bratsk Dam 世界第一大人工水库。位于俄罗斯的叶尼塞河支流安加拉河上,总库容1694亿立方米。坝区气候恶劣,年平均气温-2.6℃,严冬季节最低可达-58℃。 夏季可达35℃,全年无霜期仅84天。坝基岩层为辉绿岩。拦河坝由两种坝型组成:①位于河床部分的混凝土宽缝重力坝,包括溢流段、厂房坝段和挡水段,最大坝高125米,坝顶长 1430米,坝体混凝土443.1万立方米,最大泄量7090立方米/秒;② 连接两岸的土坝,最大坝高40米,坝顶长3710米,坝体填筑量 956万立方米。坝后式电站,总装机容量450万千瓦。工程于1954 年开工,1967年建成。 |
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条