说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 斜井井口
1)  slope collar/mouth
斜井井口
2)  inclined shaft
斜井井筒
3)  deflecting well testing
斜井试井
1.
To the tubular reservoirs with enclosed top and bottle boundaries or with constant pressure and non-boundary in horizontal direction,the numerical integration calculation quantity of deflecting well testing interpretation is great,and the numerical integration calculation is not practical.
针对上下边界封闭或定压的水平方向无界的板状油藏中,斜井试井解释数值积分计算量大、实用性差的问题,在Ozkan等人的研究基础上,提出了一种实用的计算斜井压力响应的方法,计算效率提高一个数量级。
4)  drift log
井斜测井
5)  bankhead
斜井井口出车平台
6)  deviated well
斜井
1.
Research on 3-D VSP geometry design for deviated well.;
斜井三维VSP观测系统设计
2.
Research and application of systematic lift techology for screw pump in deviated well;
斜井螺杆泵举升配套技术
3.
Research and application of an optimized design of pumping system used in deviated wells;
斜井抽油系统优化设计技术研究及应用
补充资料:井筒钻进


井筒钻进
shaft drilling

{Ingtong zuonj旧井筒钻进(shaft drilling)用竖井钻井法掘进时,利用钻井设备钻凿竖井井筒的作业。井筒钻进、洗井和支护是竖井钻井法掘进的三大工序,其中井筒钻进是主体工序。它包括钻井准备工作、钻凿、防偏和测斜、故障处理等,所用时间占总工期的80%一85%。 准备工作在此期间应完成的工作有:平整井场,保证水、电管线及道路和通讯的畅通,钻凿井筒的检查孔,建立工业和生活福利设施,检查并安装钻井设备,制备洗井泥浆,进行综合试运转等。准备工作所需时间取决于钻井工程的规模、设备大小、施工组织的合理程度。 钻凿主要工作有:下钻、起钻、接长钻杆和钻进。下钻包括下钻头、钻头就位、接钻杆、下放钻杆钻头、接风管和混合器、接主动钻杆等工作。起钻按下钻相反的顺序进行。当主动钻杆钻到最低位置时,需接一根钻杆(又称加尺),这时要停止钻进和停止泥浆循环,把主动钻杆提出转盘,并提出风管,接长一根钻杆,重新安上风管和主动钻杆,继续钻进,依此循环不已,直至钻完整个井筒。钻进时要根据地质条件正确选择合理钻进参数,注意观察转盘、钻具运转和排碴等情况。 防偏和测斜采用钻井法掘进井筒时,对井筒偏斜率有严格要求:当钻井深度小于30om时,允许偏斜率不得超过0.1%;钻深为300~4O0m时不得超过32omm,401一SOom时不得超过400mm,501~6oom时不得超过48Omm。因此在钻进过程中必须注意防止偏斜过大。井筒偏斜的原因很多,主要有钻井设备安装不当、钻压过大、冲击层中有卵石、工作面岩层软硬不均等。针对上述原因要采取相应的有效防偏措施,及时测量井筒偏斜率。当偏斜率超过允许值时,要及时纠偏。中国矿山常用的钻井测井仪有CJ一501型,CSX-731型和超声波式等。这类测井仪的测量范围是,井筒直径小于10m,井筒深度小于50om,测量精度为l%。测井仪所适应的泥浆,其粘度要小于25Pa·s,密度小于1·39/em3,温度在10一35℃。 故障处理钻井时常见的故障有泥包钻头,跳钻,卡钻,掉钻头、刀具和风管等,井筒片帮或坍塌。一旦出现这些故障,要采取相应的措施予以处理。 (何修仁)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条