1) excluded works
除外工程
3) risk-elimination project
除险工程
1.
The emergency support of construction equipment is the key-link of the success of the risk-elimination project of landslide dam,as the construction time is limited with a high construction intensity under the condition of cut-off of the road concerned;for which the selection,matching,preparation,maintenance,transportation and disposition of the relevant equipments are introduced herein.
堰塞湖除险工程时间紧、施工强度高、道路阻塞,施工设备应急保障是堰塞湖除险成功的关键。
4) international project
涉外工程
1.
The guarantee form and the type of guarantee agreement in international project of water conservancy and hydroelectric power are sorted out,and the payment guarantee system of the owner credit in international project of water conservancy and hydroelectric power is discussed.
对水利水电涉外工程项目中的保证/担保形式和保函类型进行了归类,对项目业主支付信用保证/担保制度进行了探讨,最后认为水利水电涉外工程项目中引入保证/担保制度,是规范水利水电建设市场的重要手段,特别是建立业主支付信用保证/担保制度,对于防止业主拖欠工程款具有重要的制约作用。
5) oversea project
海外工程
1.
Combining with concrete project,it analyzes existing problems and countermeasures of the oversea building project management procedures control,points out measares to control construction procedures,and accumulates oversea project construction management experiences,so as to establish good image of Chinese enterprise in international project industry.
结合具体工程实例,分析了海外建筑工程项目管理进度控制中存在的问题及赶工措施,提出了具体的施工进度控制措施,积累了海外工程施工管理经验,以树立我国企业在国际工程界的良好形象。
6) overseas project
海外工程
1.
In comparison with domestic engineering projects, the utilization of local resources of overseas project has a certain particularity because of remote distance and many changeable construction factors.
海外工程项目远离祖国,施工可变因素多,对当地资源的利用和国内工程比较具有一定的特殊性。
2.
Combining the construction of Constantine University Town in Algeria, the paper analyzes the particularity and advantage of applying Design-Build to the overseas project and elaborates on the risks the contractor will face about project design and on the precautionary measures they should adopt under the general contracting mode of Design-Build.
文章结合阿尔及利亚康斯坦丁大学城建设项目,论述在海外工程中采用设计施工总承包管理的特殊性及其优势,并详细阐述了承包商在设计阶段所面临的风险及应采取的预控措施。
3.
There are many characteristics, like big amount, more problems, language barrier, fierce competition, enormous risk, existing in overseas project.
海外工程具有金额大、问题多、语言不通、市场竞争激烈及潜伏风险较大等特点。
补充资料:坦克维修工程车(见坦克保养工程车、坦克修理工程车)
坦克维修工程车(见坦克保养工程车、坦克修理工程车)
tank maintenance %26 repair vehicle
一““、、’v‘丈人1以gUflgCnengChe坦克维修工程车(:artk Inaintenane。%26repair vehicle)装有坦克维修设备、仪器、工具的技术保障车辆。见坦克保养工程车、坦克修理工程车。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条