2) strip coal pillar
条带煤柱
1.
The new technology of waste-filling replacement mining on strip coal pillar;
利用矸石充填置换开采条带煤柱的新技术
2.
Whether the strip coal pillar is stable or not is one of the key problems of strip-partial mining.
应用突变理论建立了条带煤柱突变破坏失稳的尖点突变模型,导出了条带煤柱破坏失稳的充要条件表达式。
3.
Its success or failure hinges on the long-term stability of strip coal pillar.
条带开采是目前解决“三下”压煤的较为切合中国煤矿企业实际的方法之一 ,条带开采成败的关键是条带煤柱的长期稳定性。
3) columns with corbel
带牛腿柱
1.
Effective length of columns with corbel in mill building frames;
厂房框架带牛腿柱的计算长度
5) pilastered wall
带壁柱墙
1.
Ratio of hight to sectional thickness checking at pilastered wall;
关于带壁柱墙的高厚比验算
2.
Design value of masonry compression strength in masonry structure, local compression bearing capacity of lintel, ratio of height to sectional thickness of pilastered wall and logical value of elevated coefficient in masonry local compression strength are discussed in this paper.
对砌体结构各类砌体抗压强度设计值、过粱的局部受压承载力、带壁柱墙的高厚比以及砌体局部抗压强度以及提高系数的合理取值进行探讨,供设计人员和注册考试人员参考。
补充资料:聚煤带
聚煤带 coal-accumulation belt 地史时期形成丰富煤层和含煤沉积物堆积的地区。煤炭资源在同一时代聚煤盆地中多呈带状分布。苏联地质学家I.I.斯捷潘诺夫根据全球地史时期中发生聚煤作用的主要时期,划分为几个聚煤区。每个聚煤区又可划分为几个聚煤带。煤田或煤产地皆分布于潮湿气候带,形成聚煤带。在地质历史过程中,由于大地构造条件和气候带的不断变化,聚煤带的位置也随之发生变化。 |
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条