1) preheat position
预热位置
2) glow plug position
预热塞位置
4) preheating equipment
预热装置
1.
Feature and application of preheating equipment of conversion section in No. 4 sulphuric acid system;
硫酸四系列转化系统预热装置的特点与应用
2.
All big blast furnaces in Angang adopt a double precheating equipment,including an oneself preheating equipment,additional combustion system,smoke waste heat recovery and crest type preheating stove craft etc.
鞍钢所有大高炉都采用了双预热装置,包括自身预热工艺、附加燃烧系统、烟气余热回收和顶燃式预热炉工艺等装置。
5) front preheating process
前置预热
1.
A new front preheating process to get higher blast temperature on pebble stove was put forward according to low blast temperature and shortage of high heat value gas in Chinese iron and steel industry.
针对我国钢铁企业存在风温低、高热值煤气短缺的情况,提出了一种利用单一低热值高炉煤气获得高风温的前置预热工艺技术。
6) Position estimation
位置预估
1.
A new position estimation algorithm was presented which used as the theory foundation to design a full digital position estimation hardware scheme that can implement on FPGA (Field Programmable Gate Array),and gived the designs of all modules.
提出一种新型位置预估算法,设计了适于在现场可编程门阵列FPGA上实现的全数字硬件实现方案,详细给出了各个模块的设计方法。
补充资料:预置
1.预先陈设。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条