1) Tip of pile
桩尖、桩底端
2) tip
[英][tɪp] [美][tɪp]
桩梢,火嘴,尖端
3) pile toe
桩尖
1.
In the construction of pretensioned high strength spun concrete pile(PHC pile),the pile is directly hammered without the pile toe.
在PHC管桩的施工中常会遇到施工单位不做桩尖直接施打的情况,结合某桩基工程施工中出现的问题和静载试验的结果,探讨了桩尖对PHC管桩受力性能的影响。
5) under pile
桩底
1.
The influences of different thickness of bottom settlings are analyzed under pile and mud cakes around pile on the ultimate supporting capacity of single pile.
采用有限元数值模拟的方法计算大直径钻孔灌注桩的极限承载力,对桩底沉渣厚度改变、桩周泥皮厚度变化对单桩极限承载力的影响进行了计算分析,指出了控制沉渣、泥皮厚度的重要性,提出了控制沉渣与泥皮厚度的具体措施。
6) pile tip
桩端
1.
The bearing capacity of super-long and large-diameter bored pile tip is influenced by the facts including construction process,depth effect,size effect and so on.
阐述了超长大直径钻孔灌注桩桩端承载力的影响因素,包括施工工艺、深度效应和尺寸效应等。
2.
The analysis of pile tip settlement measuring and the data of pile testing,has ex-pressed that the stress-strain process of upper loads on pile shaft and foundation soil has elastic deformation characteristics of both pile and foundation soil.
桩端沉降测量和试桩资料的分析结果表明,桩在传递上部荷载与地基土之间产生的应力应变过程,表现为桩的弹性杆件和地基土的弹—塑性变形特征。
补充资料:暗桩
1.植立于水中而不露出水面的木桩。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条