2) construction shaft
施工竖井架
3) shaft timberman
井筒支架工
4) non-derrick formwork turnover construction
无井架翻模施工
1.
Discussion is given to the construction plan comparison,the makeup of non-derrick construction system and its safety calculation,the key procedures of non-derrick formwork turnover construction as well as the main construction points of related sub-works.
通过施工方案对比分析、无井架施工体系组成及安全验算,对无井架翻模施工方法的关键程序及相应分项工程的施工要点加以论述。
5) stabbing board
井架工操作台
6) eighty-board
井架工作平台
补充资料:施工企业技术组织措施计划(见施工企业技术)
施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise
施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条