说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 爬升顺序
1)  Climb sequence
爬升顺序
2)  raising order
顶升顺序
1.
The measures include elevation difference controlling;reasonable arrangement of raising order for each crane;identifying distances between tower cranes and strengthening safety management.
新东安市场工程采用群塔施工 ,在大多数塔臂相互交叉 ,且有大臂甚至平衡臂已覆盖场区外围建筑的情况下 ,为确保塔吊安全运行 ,施工中采取对群塔进行严格的高差控制、合理安排塔位顶升顺序、设计塔间距离 ,同时加强运行管理安全防护措施 ,在解决垂直运输的同时 ,确保了整个工程同步施工。
3)  ascending sequence
递升顺序
4)  climb [英][klaɪm]  [美][klaɪm]
爬升
1.
For the climb trajectory of a ramjet powered tactical missile,considering the feature of ramjet engine,the climb and speed-up performance of a missile are systematically analyzed.
针对以冲压发动机为动力的战术导弹的爬升弹道,首先考虑了发动机的特性,对导弹加速爬升的性能进行了系统分析,获得了导弹加速爬升过程中剩余功率和燃油消耗量随飞行状态变化的规律。
5)  climbing [英]['klaɪmɪŋ]  [美]['klaɪmɪŋ]
爬升
1.
Fault diagnosis and alarm based on knowledge for take-off and climbing of fighter;
基于知识的歼击机起飞爬升阶段的故障诊断与报警
2.
On JFYM raise formwork frame which combines together climbing frame, climbing form, big formwork and gondola technologies in the structure and decoration construction, advanced technologies such as hydraulic lift and programable control are adopted to realize integral ascending and separate descending in precise synchro-control.
JFYM升降模架将爬架、爬模、大模板、吊篮等技术在结构施工与装饰施工中结合在一起,采用爬升箱液压升降和可编程控制等先进技术,实现连体上升和分体下降,做到高精度的同步控制;导向、防倾、防坠、同步及安全防护等设备配套,安全可靠,已被列为2003年建设部科技成果推广项目,在约180万m2的高层建筑施工中成功应用,效果良好。
6)  the ascending order principle
顺序升级主义
补充资料:顶升
      利用千斤顶和交替填塞的柱块,将在地面上就地拼装或灌筑成型的屋盖结构逐步顶升到设计标高的施工方法。这种方法无需大型起重设备,可将在地面施工完毕的整个屋盖,包括屋面防水、油漆及管线等,一次顶升就位。一般有上顶升和下顶升两种。
  
  ① 上顶升法。千斤顶倒支于屋盖结构支点下的垫块上,垫块即为以后的柱帽。开始时,柱帽支承于柱基块的两侧冀上,随着千斤顶的进油和回油,填进临时垫块和换填正式柱块,柱帽即将屋盖结构逐步升高。柱块为方形和门字形(见图)。柱块在安装时宜及时铺垫水泥砂浆及焊接帮条,并对柱块的开口加以封闭,以增强柱子的稳定性。上顶升法中千斤顶的顶升重量恒定,稳定性较好,目前采用较多。因属高空作业,顶升过程中应采取措施,防止屋盖结构偏移,并注意顶升的同步。
  
  
  ② 下顶升法。千斤顶始终放在柱基上,随顶随填柱块,可以减少高空作业,但顶升重量逐渐增加,尤其是在柱基处形成活动支点,稳定性差,已较少采用。
  
  顶升法也有用格构柱的,比填柱块安全,能防止结构偏移。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条