1) maximum letdown flow
最大下泄流
3) maximum permitted runoff
最大允许下泄量
1.
According to the water quality requirement of the drinking water source in Huainan City, the maximum permitted runoff from the dam-controlled branches was calculated under different in flow conditions form the upstream.
以淮河干流鲁台子—石头埠段为例,针对河段内淮南市饮用水源的水质要求,在不同的上游来水条件下,计算闸控支流污水的最大允许下泄量;预测污水团到达水源区的浓度。
5) discharged flow
下泄流量
1.
Based on Tibet Laluo Hydroproject and Irrigation Project,some methods in common use are adopted to calculate the eco-environment water demand and contrast with the discharged flow which the project study out.
以西藏拉洛水利枢纽及配套灌区工程为实例,采用多种计算方法对工程拟定的下泄流量方案进行分析比较,并指出工程下泄流量方案存在的问题。
补充资料:最小辐亮度与最小辐照度(见核爆炸火球)
最小辐亮度与最小辐照度(见核爆炸火球)
minimum-brightness and minimum-irradiance
zuixiao fuliangdu yu zuixiaofu乙haodu最小辐亮度与最小辐照度(minimum-brightness and而nimum一irradianee)见核爆炸火球。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条