说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 水下固井设备
1)  subsea cementing equipment
水下固井设备
2)  cementing equipment
固井设备
3)  cementing unit
固井设备
1.
Investigation in explosion proof system for engines on cementing unit.;
固井设备发动机防爆系统研究
4)  down hole equipments
井下设备
5)  subsea completion system
水下完井井口设备
6)  subsea equipment
水下设备
1.
Based upon the demand of exploration and development of oil field in deep water of PRC,the advanced new technologies of dual gradient drilling system used for deep water was introduces,a few procedures for realizing of dual gradient drilling system was given,and the subsea equipments used for the dual gradient drilling system were provided.
根据我国勘探开发深水油田的需要,介绍了用于深水的先进的双梯度钻井工艺,给出了实现双梯度钻井的几种方案,提出了双梯度钻井所需要的水下设备。
补充资料:固井


固井
sealing of drop-shaft bottom to rock

  gUJ,ng固井(sealing of drop一shaft bottom to roek)在竖井沉井法掘进中将沉井井筒永久固定的技术。当沉井下沉达到设计深度后,为防止井筒继续下沉或出现位移,需采取加强井壁和土帮的固定措施,以隔离井筒与井外含水层的水力联系,这是沉井施工的最后一道工序。固井采取的主要措施是联接套井与沉井的上口,井筒壁后注浆以增加侧面阻力,砌筑沉井基座以增加正面阻力,最终使井筒保持稳固。 在固井之前,若刃脚坐落的基岩上面无隔水粘土层,则需构筑封底止水垫,以防止井内排水后,发生涌砂冒泥或突水事故。封底后,首先要清除套井与沉井之间的泥浆,然后在其中浇灌片石混凝土,同时将沉井上口的钢筋与套井锁口的钢筋焊接好,并浇灌混凝土,使沉井与套井连成整体。最后,排除井内积水,进行壁后注浆。一般采用分段下行、分段内上行式注浆方法。当采用泥浆护壁减阻时,要先注清水,把泥浆置换出来后,再注水泥浆。井底筑有止水垫时,要进行工作面预注浆。待浆液凝固后,破除封底止水垫,在基岩中砌筑沉井基座。待基座砌好,沉井施工结束,即转入井筒普通法掘进。 (石达民)
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条