1) Time-Scaled Network Diagram
时标网络图
1.
Then analysis aim at the influencing factors of four periods was carried out with the time-scaled network diagram.
将交货周期分为生产等待、生产、检验、出库4个周期,并利用时标网络图针对每个周期的影响因素进行了分析,提出了月度资源计划量、科学的生产计划顺序、严格的计划顺序管理制度、设备故障管理、最迟开工时间、多次生产的时间间隔、初验批次合格率、试样委托批量、试验批量、判定批量、科学计划供料量、完整供料、同船级社船板集中订货、集中生产、运输计划编制周期、动态科学调度车辆等大量改善措施。
2) network plotting system
网络标图
3) timescaled network chart
时标网络
1.
This paper introduces a method of dynamic analysis of construction progress by means of the progress front lines on the timescaled network chart, which is a useful and effective tool to the planners for the dynamic control of the construction progres
结合实例介绍了利用在时标网络图上标画实际进度前锋线进行进度偏差分析的方法。
4) late time mark network
迟时标网络
1.
The method of weaving the late time mark network project;
迟时标网络计划的编制方法
5) time coordinate network
时标网络计划
1.
in this paper,one method was introduced to estimate the work force with time coordinate network.
运用时标网络计划进行劳动力总量计算的方
6) early time scale network planning
早时标网络计划
1.
Fast drawing method of the early time scale network planning;
早时标网络计划的快速绘制法
补充资料:标图
以军队标号和文字将军事情况标绘在地图上的作业。通过标图能把复杂的军事情况简明地显示在地图上。广泛用于军队指挥、军事训练和学术研究。指挥员和参谋人员在准备和实施作战任务中,通常要标绘敌我情况图、首长决心图、作战计划图、协同动作计划图、工作图、行军路线图、作战经过图等。标绘内容一般有:双方兵力部署、阵地编成、作战决心以及作战经过等。标图作业,依据文字材料或口述情况,采用规定的军队标号,结合地形进行。通常先标战斗分界线,然后按先敌方后己方、先本部后友邻、先前沿后纵深、先主要方向后次要方向、先队标后队号的顺序标绘。如果情况过于复杂,标号发生重叠时,应保留重要情况,舍去次要情况,或互相避让。临时增补的标号要附以图例说明。标号不易表达的事项应编写附记。标图要求迅速及时,突出主题,清晰易读,正确反映客观实际。