说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 团队技术计划
1)  Project Technical Plan
团队技术计划
2)  Team Development Plan
团队发展计划
3)  technical plan
技术计划
1.
Study on methods of making technical plans of empty car assisted by computer;
空车技术计划方案计算机辅助编制方法研究
4)  freight plan
技术计划
1.
Mathematical model on vacancy car distribution of freight plan;
技术计划空车调整的数学模型
2.
It was introduced railway freight plan briefly and also explained the goal and function of freight plan management information system as well as the meaning of it.
简要介绍了铁路运输工作技术计划,说明了技术计划管理信息系统的实现目标和功能,并阐明了系统实现的意义。
3.
It was applied mathematical methods of economy mathematics and operational research into making railway freight plan, mamenMtical models on vacancy car distribution were abstracted as well as mtroduoed particularly.
将经济数学和运筹学中的数学方法应用于铁路运输生产技术计划的编制当中,抽象出空车调整的数学模型,并对该模型的理论和实现作了详细的介绍。
5)  plan method
计划技术
6)  High-tech enterprises team
高技术企业团队
补充资料:采掘技术计划


采掘技术计划
extraction-development plan of mine

  eol]uej{shu{Ihua采掘技术计划(extraetion一devezopment planof mlne)以采掘(剥)平衡为重点,全面安排矿山采掘(剥)生产的技术文件。采掘技术计划分为年度、季度和月度采掘计划,以年度计划为仁在年度采掘技术汁划中,要根据矿山生产规律和本矿的长远规划、总体设计及生产特点,把矿山生产的各种可变因素有机地组织起来,做到设备合理地布置,采场科学地推进,人员合理地组织,生产工序合理地配合,在保证正规采掘的基础上,确定产量、质量和各项技术经济指标的最佳方案。采掘讨一划是矿山企业生产经营计划的基础,是矿山组织生产的主要依据。 基本内容包括文字说明、表格和图纸三部分。 文字说明对上年度采掘技术计划执行情况进行总结,分析计划完成情况和存在的主要问题,指出本年度采掘技术计划编制的原则、目标、采掘重点和主要措施等。 表格一般有十一种表格:主要产品产量汇总表、地质储量和矿量保有计划表、生产勘探工程计划表、露天矿山采场采剥(掘沟)计划表、露天矿山排土计划表、地F矿山采(出)矿计划表、地下矿山掘进计划表、采出矿石质量计划表、主要技术经济指标计划表、主要设备大中修和技术状况计划表和维持简单再生产工程计划表等。图纸主要图纸包括综合平面采掘计划图和有代表性的剖面图,以及分层平面采掘计划图。其他图纸有露天矿排土布置,地下矿通风系统及风、水、电供应系统和重点工程单体设计图等,各矿山可根据需要列为附图。 计划编制过程编制采掘技术计划要贯彻国家有关方针、政策,并结合矿山实际情况,协调好各种关系。编制工作要按步骤进行。计划要体现既节省人力、物力和财力,又能获得最大经济效益的原则。 计划编制应协调的关系主要包括:(1)当前生产与长远发展的关系当前生产要兼顾长远发展,坚持正规采掘,安排好生产勘探工程,保证完成长远规划中的重点工程,确保生产准备矿量的平衡,为矿山持续正常生产创造条件。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条