1)  across back
后背宽
2)  B.mid. arm-hole
后背宽
3)  B.W.=back width
后背宽
4)  BACK ACROSS
后背宽
5)  BACK MID-ARMHOLE
后背宽
6)  back cross
后背宽,[粤]后背阔
7)  back
后背
1.
The supporting and back structures are important temporary structures in jacking construction of bridges and culverts, and are of great importance in ensuring smooth construction and guaranteeing the time limit for a project.
支护和后背是桥涵顶进施工中重要的临时结构,对施工顺利与否、保证工期起着关键的作用。
8)  penstock downstream of dam
坝后背管
1.
In this paper,In case of the Three Gorges Project,the finite element model of the penstock downstream of dam with cushion course is built by using the software of ANSYS;the stress state of penstock is calculated and analyzed.
以三峡水电站坝后背管为例,借助有限元软件ANSYS建立了设置软垫层坝后背管有限元模型,计算分析了设置软垫层坝后背管结构应力状态,并与结构模型试验对比。
9)  use of original soil as backing
原土后背
1.
It also reduced the trouble for construction incurred by the use of original soil as backing,and thus accelerating the schedule in construction of the project.
 结合常州地区供水一期工程介绍了大口径钢筒预应力混凝土管的中间试压技术,它克服了长距离输送管道因试压需间断施工的弊端,使管道间断施工变成连续施工,并减少了预留原土后背给施工造成的麻烦,加快了工程施工进度。
10)  penstock laid on the downstream face of dam
坝后背管
1.
Application of the elasticity center method of structure mechanics for penstock laid on the downstream face of dam;
坝后背管结构力学弹性中心法的应用
补充资料:坝内排水管


坝内排水管
drains in concrete or masonry dam

ba’ne一Palshuiguan坝内排水管、drains一n eonerete ormasonry dam)排除棍凝土或其它污工坝坝体内部渗水的孔管。用以降低坝体浸润线位置,减少坝体扬压力。 坝体排水管通常做成铅直的或接近铅直的,位于上游侧防渗混凝土层之后,与上游坝面的距离一般不小于坝前水深的1/10一1/12。其上端通到坝顶(或溢流堰面以下),下端通到纵向排水检查廊道或基础排水廊道。通过廊道排水沟或集水井再将渗水排向下游(见图)。排水管卜水管之间剖面的浸润线 一排水管剖面l泊勺浸润线横向廊道 横向廊道内的排水沟即炸教 道 廊 向 纵排水管布置示意图 坝内排水管间距通常为2一3米,内径一般为15一25厘米。常用预制多孔混凝土管,在浇筑混凝土时埋入坝内;有时也用立模法或拔管法在坝内做成排水孔;运行中增设的坝体排水,则为通向廊道的机钻孔。排水孔管在廊道的出露处常加设一段铸铁管,以便集引漏水进行渗漏量观测。 为了排除从横缝中漏入坝体的渗水,有的坝在横缝止水设施的后面也设置排水孔管。必要时还设置排水井兼作检查井。(李珍照)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条