1) Pressure tunnel
壓力隧道
2) tunnel pressure
隧道压力
1.
To study the stability of tunnel pit-wall,many calculation methods of the tunnel pressure are put forward.
为了研究隧道洞壁的稳定问题,人们提出了许多隧道压力的计算方法,尽管在隧道稳定领域有很多分析方法,但人们在隧道设计与施工过程中,仍然非常重视已有的各种经验和施工现场的原位监测工作。
3) pressured tunnel
压力隧道
4) power tunnel
电力隧道
1.
Study of major auxiliary systems configuration for 500 kV power tunnels
500kV电力隧道主要辅助系统设置研究
2.
220kV power tunnel project of Beijing Huangsi is researched,the iniatial design of structure and support system are introduced.
以北京黄寺220 kV送电工程电力隧道为背景,对工程的结构与支护进行初步设计。
3.
Especially in center cities like Shanghai, for there is a serious lack of earth resource, the power supply method of laying big section power cable in a power tunnel is becoming a kind of efficient measure of satisfying the high charge density and increase.
特别在类似上海这样的中心城市土地资源异常稀缺的今天,采用电力隧道内敷设大截面电缆的供电方式已经成为满足中心城区高负荷密度和高负荷增长需要的有效手段。
5) thermal power tunnel
热力隧道
1.
Security aspect and measurements while tunneling of the thermal power tunnel from below buildings on ground surface;
热力隧道下穿地面建筑物的安全评价与对策
6) tunnel mechanics
隧道力学
补充资料:锅炉、压力容器、压力管道及特种设备定期检验
锅炉、压力容器、压力管道及特种设备定期检验
periodic inspection of boilers, pressure vessels, pressure piping and special equipment
guolu YOli侧飞扣1 YOli gLJal对印ji tez陌叩劝以拍1 dingqi】,on四n锅炉、压力容器、压力管道及特种设备定期检验(peri诫c inspectionof城le。,p~切reves-Sels,p~二piPing ands衅过闪uiplr屺nt)为保证设备的安全使用,规定设备必须按一定周期进行法定的、强制性的检验。定期检验由政府设立的检验所、使用单位或行业检验站进行。检验单位及检验人员必须具有与所检设备相适应的资格。设备使用单位应该建立定期检验制度,做好检验计划,按时向检验单位提出申请。检验单位应该保证及时进行检验,检验按有关检验规则进行。检验时,设备使用单位应做好配合工作,提供必要的运行资料。检验完毕,检验单位要出具检验报告,对设备能否使用,要作出明确结论。如设备有缺陷,要提出是否修理、监护使用和报废的处理意见。锅炉压力容器安全监察机构根据检验机构的报告,发使用许可证书。有缺陷的,责令使用单位修理,修理后检验仍不符合安全要求的,则通知报废。使用单位逾期不进行定期检验,锅炉压力容器安全监察机构有权停止其设备运行。(陈亦惠)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条