1) union terminal
联合车站,总站
2) central station
汽车总站
3) Station interlocking
车站联锁
1.
The construction companies usually have the simulation panel made up of knob switching board to simulate the outdoor track occupation, the release condition of signal and status of point, since the limitation and disadvantages of the simulation mode itself, the paper proposes the method for the intellectualization of station interlocking conduction test.
在车站信号工程的施工中,开通前都要进行车站联锁导通试验,以验证信号设备联锁的正确性。
2.
Based on analyzing the feature of computer simulation system and the requirements of railway signal,interlocking and blocking,the paper studies the method to implement station interlocking,section blocking and signal controlling in the simulation system of train reception/departure and control, highlights the discussion on general-purposed interlocking algorithm.
在分析模拟系统特点和铁路信联闭的功能需求基础上,研究了在列车接发与调度指挥模拟实验系统中用软件完成车站联锁和区间闭塞的实现方法,着重论述了适用于模拟系统的通用联锁逻辑算
4) Combined station
联合站
1.
Energy saving and consumption cut-down at a combined station in later stage of oil field production;
油田开发后期联合站的节能降耗
2.
According to the technological characteristic of oilwater separation in combined stations, a dynamic model of oilwater separation is estiblished.
建立了联合站油水分离过程的动态模型,并对模型进行简化处理。
3.
A suit of safety assessment system which fits for the combined station is established on the basis of consulting the research results of safety assessment at home and abroad, according to the practical production character of ZhongYi combined station that there are many hazard property of combustible, explosive, leaky and filtering matters.
在借鉴国内外风险评价研究成果的基础上,针对中一联合站系统存在的易燃、易爆危险物质较多、渗漏、泄漏事件易发、工艺工程危险等特点,建立了一套适合于联合站风险评价的技术体系。
5) United Station
联合站
1.
Testing and Analysising of Efficiency and Energy consumption in United Station in Gathering and Transfering System With Supper High-water-cut;
特高含水集输系统联合站效率及能耗测试与分析
2.
Based on the brief analysis of workplace and working medium of united station in oil extraction plant,some safety control measures for workplace and working medium are proposed.
通过对采油厂联合站工作场所特点和工作介质进行简要分析 ,提出工作场所及工作介质的安全管理对
3.
In order to confirm numeric model of controlling system for oil field united stations output,the paper use neural network to design the system controller and utilized a three large BP network to compose the PID controller,which solved the problem that the traditional PID adjuster is difficult to determine the parameters on line moment,and improve the effect to the system and the environment.
针对油田联合站集输控制系统数学模型的不确定性,采用神经网络来设计系统的控制器,利用1个3层BP网络构造PID控制器,在一定程度上解决了传统PID调节器不易在线实时整定参数的不足,提高了控制器对系统和环境的控制效果。
补充资料:军用汽车储备里程(见军用汽车使用管理)
军用汽车储备里程(见军用汽车使用管理)
initial drive of military motors
lunyong qiche ehubei lieheng军用汽车储备里程(mileage reserVe Ofmi一itary motors)见军用汽车使用管理。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条