1) tunnel section scale
隧道断面测定器
2) surveying of tunnel contour
隧道断面测量
1.
At present, with the constant growth of the underground construction in our country, we should deal with the surveying of tunnel contour in the control of railway, pavement, water conservancy, water and electricity, mine.
隧道断面测量是确保隧道开挖安全,提高隧道开挖效率的重要因素;其质量事关隧道施工质量的验收、施工成本;同时,隧道断面测量的结果还是优化隧道设计和施工的重要依据。
3) tunnel section
隧道断面
1.
This paper introduces the operation principle, hardware and software of a new portable laser measuring instrument of tunnel section developed using a phillips 87C552 single chip microcomputer.
介绍一种基于飞利浦 87C5 5 2单片机系统新型便携式隧道断面激光测量仪的测量原理、硬件组成和软件设计。
4) TM tunnel section measurement system
TM隧道断面测量系统
1.
This paper describes an application of the TM tunnel section measurement system as an advanced tunnel section measurement system,in the No.
TM隧道断面测量系统是一种先进的隧道断面尺寸检测一体化系统。
5) large section tunnel
大断面隧道
1.
Taking for example of the excavation Pansteel Baima iron ore mine,the construction method and precautions for large section tunnel in fracture weak strata were introduced.
以攀钢白马铁矿一期工程1600主平硐的开挖为例,介绍了在软弱破碎岩层中大断面隧道的施工方法及注意事项。
2.
This paper is based on the construction of linjiangmen station tunnel of the Chongqing Jiaoxin Light Railway, the demolition shock absorption applied to urban shallow covered large section tunnel in hard rocks under complicated conditions is introduced.
以重庆轻轨较新线临江门车站隧道为例,介绍了复杂条件下城市浅埋硬岩特大断面隧道减震爆破施工方法,由于采用了一系列综合减震措施,开挖爆破对隧道周边围岩的影响降低到最小程度;在爆破设计中,掏槽眼增加了减震孔,周边眼增加了导向孔,采取隔孔装药方式,对提高炮眼利用率起到了良好的作用。
6) tunnel with large cross section
大断面隧道
1.
The numerical simulation of constructional mechanical responses of highway tunnel with large cross section;
大断面隧道施工力学响应数值模拟研究
补充资料:异形断面钢材(见异形断面型材)
异形断面钢材(见异形断面型材)
special section steel
,一、u以uu、’“飞豆on gQngC01异形断面钢材(speeial Seetion steel)见异形断面型材。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条