2) temporary shiplock
临时船闸
1.
Grouting treatment for transverse joint seepage of TGP temporary shiplock;
三峡工程临时船闸坝体横缝渗漏灌浆处理
2.
During November 2002 to April 2003, the diversion open channel of the Three-Gorges Project will be closed and temporary shiplock will undertake the duty of single-line navigation.
2 0 0 2年 11月~ 2 0 0 3年 4月 ,三峡工程导流明渠将封堵 ,临时船闸将承担单线通航的任务。
3.
Based on the characteristics and application practice of the hydraulic system of the Three-Gorges temporary shiplock, it analyzes the miter gate drifting trouble of the temporary shiplock and the solutions.
从三峡临时船闸液压系统的特点及运用实践方面,分析临时船闸人字门漂移故障及解决措施。
3) time to abandoning
弃船时机
1.
The time to abandoning a damaged ship is in great relation with the strength,stability and buoy- ancy.
弃船时机与破损进水船舶的强度、稳性、浮态达到临界状态的最短时间有直接的关系。
4) go shore together
同时离船
1.
Analysis on the ship officers of management level go shore together;
管理级船员同时离船问题分析
5) ship berthing time
船舶停时
1.
The paper points out the necessity that ship berthing time shonld be shortened in northern sector of Beijing hangzhou canal in Jiangsu province.
阐述了京杭运河苏北段缩短船舶停时的必要性,着重分析了构成船舶停时的主要因素,揭示了导致船舶不必要泊港、泊闸时间的主要原因,并提出缩短船舶停时的措
6) drilling draft
船钻井时
补充资料:关于临时建设和临时用地
临时建设是指必须限期拆除、结构简易、临时性的建筑物、构筑物、道路、管线或其他设施;临时用地是指由于建设工程施工、堆料或其他原因,需要临时使用并限期收回的土地。批准临时建设和临时用地的使用期限,一般均不超过两年。
临时建设和临时用地都对城市规划的实施产生重要的影响,因此,城市规划行政主管部门必须对城市规划区内的临时建设和临时用地进行严格的规划管理。任何单位和个人需要在城市规划区内临时使用土地或进行临时建设都应当征得城市规划行政主管部门的同意,不得影响城市规划的实施。
鉴于临时建设和临时用地的情况比较复杂,各地的管理体制和管理条件又不尽相同,因此,《城市规划法》第三十三条规定:“在城市规划区内进行临时建设,必须在批准的使用期限内拆除。临时建设和临时用地具体规划管理办法由省、自治区、直辖市人民政府制定。”
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条