说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 常温试验
1)  cold test
常温试验
2)  acceptance testing at ambient temperature
常温验收试验
3)  cold hydraulic test
[常温]水压试验
4)  cold-flow test
冷形变试验<常温蠕变试验>
5)  treatment at ambient temperature
常温中试
6)  routine test
常规试验
1.
Based on the nomograph by van der Poel, this paper deduces a general formulation with Penetration Index, PI, and the temperature difference between actual value and Softening Point (R&B), ΔT, as variables for the stiffness modulus of asphalt binders using routine test data, through regression analyses.
在范得普诺模图的基础上,以针入度指数PI和实际温度与软化点(环球法)的差ΔT为变量,通过回归分析,推演了基于常规试验数据的沥青劲度模量一般公式表达。
2.
Firstly, developing status of routine test of hydroelectric generation set and trouble diagnosing in China and abroad are introduced; Secondly, the article specifies the structure of CIMS and basic theory and technology.
文章首先介绍了水电机组常规试验及故障诊断国内外发展现状;然后给出了系统的结构框架和理论技术说明,本系统由监测装置和软件分析系统组成,信号处理采用了快速傅利叶变换和数字滤波技术;最后详细分析了系统功能,监测装置使用80C196KB和89C52单片机技术开发,监测软件使用Visual Basic 6。
补充资料:承包人要求发包人组织工程验收,包括隐蔽工程的验收和工程竣工的验收的权利
承包人要求发包人组织工程验收,包括隐蔽工程的验收和工程竣工的验收的权利:根据我国《合同法》的第278条规定隐蔽工程在隐蔽以前,承包人应当通知发包人检查。发包人没有及时检查的,承包人可以顺延工程日期,并有权要求赔偿停工、窝工等损失。根据《合同法》第279条中的规定建设工程竣工后,发包人应当根据施工图纸及说明书、国家颁发的施工验收规范和质量检验标准及时进行验收,因此在工程完成时组织竣工验收,也是发包人的主要义务。建设工程竣工验收合格后,方可交付使用,未经验收或者验收不合格的,不得交付使用,发包人对未经验收的工程,提前使用或者擅自动用的,对发现的质量问题由发包人自行承担责任。-------------《民法》第一版,第514页。魏振瀛;《合同法》的第278条
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条