1) pouring operation
浇铸操作
2) start casting operation
开浇操作
3) gating practice
浇口操作
4) casting
[英]['kɑ:stɪŋ] [美]['kæstɪŋ]
浇铸
1.
Outline of Technology Development on Refining and Casting for Bearing Steel;
轴承钢精炼与浇铸技术发展概况
2.
The Studies of Synthetical Properties on Casting Smokeless CMDB Propellants with High Pressure Plateau Combustion;
高压平台浇铸无烟改性双基推进剂综合性能研究
3.
Two Methods for Stress Test During Explosive Casting
炸药浇铸过程中应力的两种测试方法
5) cast
[英][kɑ:st] [美][kæst]
浇铸
1.
The numerical simulations of the casting process for making metal matrix composite by infiltrating melting alloys into a fiber preform arestudied.
通过对浇铸过程的数值模拟 ,研究了可控初边值条件对浇铸过程的影响及对铸件中合金基体最终残余应力及塑性应变的影响 ;分析了浇铸得以完成及减少残余应力、应变的条件 ;将计算结果与已有的相似实验结果进行了比较 ,分析了数值模拟的可靠
2.
The ultrasonic parameters,such as amplitude and wave shape and ultrasonic velocity were monitored during explosive cast process with the heat preservation and natural cooling by using ultrasonic transmission test.
结果表明,底部位置的超声波幅明显大于中部和上部,说明炸药浇铸的底部质量最好;在炸药浇铸凝固相同位置保温条件比自然冷却下超声波幅强,说明保温工艺有利于控制炸药浇铸质量。
6) pouring
[英][pɔ:] [美][por]
浇铸,浇注
补充资料:212113浇冒口清理滚筒操作规程
生产率:5吨/时
1、遵守铸造设备通用操作规程。
2、工作前还必须遵守:
a、 检查滚筒内部锰钢板是否松动、如有松动,应及时紧固好;
b、 检查滚筒体入口处是否与滑道相碰,如果相碰应于脱开;
c、 先点动试车,然后空运转2-3分钟,检查传动系统(电动机、联轴节、减速器)和滚筒体的运动是否平稳,确认一切正常后,方可进行生产。
3、工作中还必须遵守:
a、 开车时,先开通风机,后开滚筒。停车时,先停滚筒,后停通风机;
b、 经常注意进料情况,过宽过长的料不得进入滚筒内,以免卡住滚筒,使得滚筒体撬起,甩到地坑内,造成设备事故;
c、 滚筒进料时,操作人员不要在地坑内停留;
d、 设备开动时,如果滚筒压在挡轮上,应通知维修人员调整,以免引起轴瓦发热,甚至烧坏轴瓦;
e、 不许浇冒口积压在滚筒出口处,以免妨障滚筒体动动。
4、工作后滚筒体内的浇冒口应完全卸尽。
1、遵守铸造设备通用操作规程。
2、工作前还必须遵守:
a、 检查滚筒内部锰钢板是否松动、如有松动,应及时紧固好;
b、 检查滚筒体入口处是否与滑道相碰,如果相碰应于脱开;
c、 先点动试车,然后空运转2-3分钟,检查传动系统(电动机、联轴节、减速器)和滚筒体的运动是否平稳,确认一切正常后,方可进行生产。
3、工作中还必须遵守:
a、 开车时,先开通风机,后开滚筒。停车时,先停滚筒,后停通风机;
b、 经常注意进料情况,过宽过长的料不得进入滚筒内,以免卡住滚筒,使得滚筒体撬起,甩到地坑内,造成设备事故;
c、 滚筒进料时,操作人员不要在地坑内停留;
d、 设备开动时,如果滚筒压在挡轮上,应通知维修人员调整,以免引起轴瓦发热,甚至烧坏轴瓦;
e、 不许浇冒口积压在滚筒出口处,以免妨障滚筒体动动。
4、工作后滚筒体内的浇冒口应完全卸尽。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。