1) inverted plump line pipe
倒垂塔
2) inverse plummet
倒垂
1.
combination of both type dem, some efficacious conclusion is reached, Which provides reliable provement for the optimal design of inverse plummet system, and posses high practiceu value.
倒垂线作为大坝安全监测中的位移基准,必须具有稳定性。
3) tower falling down
倒塔
1.
It is pointed out that shed bridging of insulator and the pollution in the ice cause the icing flashover frequently,and the thickness of icing is signifcant above the design value,the excess icing load cause the tower falling down and wire broken,and the differential i.
分析认为绝缘子严重覆冰后爬距大幅减小以及冰中存在的污秽导致了线路频繁冰闪,线路实际覆冰厚度显著超过设计值,荷载过大引发了倒塔和断线,不均匀覆冰导致了导线舞动以及变电设备损坏。
2.
The heavy icing damages the weak part of tower and meteorological condition causes the tower falling down.
针对2004年底和2005年初部分地区的500 kV线路冰闪跳闸、导线舞动和倒塔断线事故,分析了冰害事故的特点及原因。
4) tower collapse
倒塔
1.
Because of its large scale and intensity,as well as long duration,the bad weather severely damaged power grid facilities by causing many tower collapses and line disconnections within short period of time.
2008年年初我国南方部分地区出现了历史罕见的强降温和持续雨雪冰冻天气,由于其范围广、强度大、持续时间长,造成了电网设施大量损毁,在短时间内倒塔、断线事故集中发生。
2.
The damage of the transmission lines in Hunan during the 2008 ice storm is surveyed and the main causes for the tower collapses and line failures are analyzed.
为分析湖南2008年冰灾引起的倒塔原因,现场调查了2008年湖南冰灾期间≥220kV输电线路的受损情况,发现倒塔线路覆冰厚度主要集中在20~60mm,同时微地形和微气象造成覆冰加重和覆冰的不均匀性,档距、塔形等对线路倒塔也存在影响。
5) collapsed tower
倒塔
1.
Distribution laws of the collapsed towers about tower type, terrain and its features, and design factors are shown according to the statistical figures of 500 kV transmission lines of SGCC.
根据国家电网公司系统500kV线路倒塔的分类统计,分析了倒塌铁塔在塔型、地形地貌、设计条件等方面的主要分布特征。
2.
At the beginning of 2008,an infrequent and serious ice cover disaster in the South resulted in bad ice transmission lines,large-scale collapsed tower and long-playing power breakdown.
2008年初,南方发生罕见的覆冰严重自然灾害,导致输电线路严重覆冰,发生了大面积倒塔长时间停电事故。
6) tower failure
倒塔
1.
The forming course of tower failure in 220 kV Zhaoqi line in the north of Shanxi power network on July 3,2004 was introduced.
介绍了2004年7月3日山西北部电网220kV赵七线倒塔事故的形成过程,并结合气象情况、设计、施工、设备等因素分析了倒塔事故的原因,提出整改建议及措施,为电网中运行的同类型杆塔的维护、新线路的设计提供了经验参考。
补充资料:倒垂
1.指物体倒悬着垂下。 2.指人头朝下脚朝上地被倒挂,比喻处境极其困苦危急。 3.倒挂着下缒。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。