说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 整体进度
1)  overall progress
整体进度
2)  progress adjustment
进度调整
1.
Fuzzy dynamic programming method for progress adjustment of project mangement;
项目管理中进度调整的模糊动态规划方法
3)  whole evolution
整体进化
1.
In this paper, by combining mathematical models and the underlying physical systems, the concept of blown-ups introduced for the study of whole evolutions is elaborated deeply.
通过将数学模型和被它所解释的物理系统的结合,在引进溃变概念的基础上,对整体进化和溃变概念进行更进一步的深入而细致的研究。
2.
Through comparing linear and nonlinear evolutions, it is observed that discontinuities and singularities are the fundamental characteristics of nonlinear whole evolutions.
通过对线性进化与非线性进化的比较,可以发现不连续性和奇异性是非线性整体进化的基本特征。
4)  Whole Advancement
整体推进
1.
Reviewing the 30-year reform and open policy of China,we use neo-liberalism for reference in the strategic process of China s economic reform from increment to whole advancement,and it has brought the significant influence which contains not only positive but also negative.
回顾我国改革开放30年的历程,新自由主义在中国经济改革由增量改革到整体推进的战略过程中不免有借鉴的成分,产生了重大的影响,既有积极的也有消极的。
5)  Group of offensive
整体进攻
6)  revise a schedule
调整进度表
补充资料:单项工程施工进度计划


单项工程施工进度计划


  定。均衡性是用均衡系数来表示,计算公式如下:工程均衡系数二某分项工程施工期内最高工程量工人人数均衡系数=施工期内最高用工人数l单项工程施工进度计划]确定单项工程中各工序的施工顺序和施工时间的计划,是单位工程施工组织设计的主要组成部分,是具体指导施工的文件。它使单位工程在施工总进度计划和施工企业生产计划的指导下,在规定的期限内,有条不紊地完成拟建工程的施工任务。它的编制的理论依据主要是流水作业原理。其编制步骤一般如下:1.划分工序,确定各工序间的施工先后顺序,并计算工程量,确定各工序的作业时间。2.组成工程组合。由于单位工程所包含的工序数目很多,为了使组织工作简化,一般是把各分项工程(工序)再分组,组成若干分项工程的组合体,即工程组合,把每一工程组合联系起来或组成流水线,然后把它们互相搭接起来而成为整个单位工程的施工进度计划。3.把各工程组合或流水线搭接起来,形成初步的单位工程施工进度计划。组织流水作业的方法,一般是先分别把各工程组合内的分项工程搭起来,组成条条流水线的流水作业,然后再把各条流水线搭起来。各条流水线的搭接方法用累加数列错位减取大差的方法进行。还有一部分不能组织流水或与其他工序无关的工序,根据具体情况搭接安排即可。4.检查、调整、修正初步的单位工程施工进度计划。确定了初步的单位工程施工进度计划以后,就要进行网络时间计算,并检查是否合理。首先要检查工期是否接近最佳工期和符合总进度计划的规定,如果不符则要采取有效办法加以调整。5.计算技术经济指标。单位工程施工进度计划编好后,应评价其经济合理性。一般用均衡系数来衡量,绘制各分项工程施工人数和主要材料消耗量的动态曲线,观察其是否保持均衡。如动态曲线发生高峰低谷频繁波动,则应调整进度,使其趋于均衡稳
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条