1) dredging works
挖沙工程;挖泥工程
2) engineering excavation
工程开挖
1.
It is analysed of the surface movement resulting from engineering excavation, such as underground mines, open-pit mining, railway, highway, foundation pit, tunnel and underground engineering, and its deformation's characteristics.
分析了地下矿山、露天矿山开采 ,铁路、公路、基坑、隧道和地下工程开挖引起的周围地表移动与变形的特点。
3) rock excavation
挖石工程
4) excavation work
挖土工程
5) trenching works
挖坑工程
6) excavated volume engineering
挖方工程
1.
Meanwhile,being aimed at the present not-unified calculation standard of earth pressure,the paper suggested adopting a unified standard to judge the calculation condition in order to standardize the calculation of earth pressure on retaining structure in excavated volume engineering,which is worthwhile in engineering.
本文以挖方工程挡土结构土压力计算问题为研究对象,推导了作为判断土压力计算条件重要依据的理论滑动面倾角的计算公式,并针对现行规范中土压力计算条件的判断方法不完全统一的现状,结合工程实例对比分析了不同判断方法及其土压力的计算问题,提出的判断挖方工程挡土结构土压力计算条件的新方法。
补充资料:坦克维修工程车(见坦克保养工程车、坦克修理工程车)
坦克维修工程车(见坦克保养工程车、坦克修理工程车)
tank maintenance %26 repair vehicle
一““、、’v‘丈人1以gUflgCnengChe坦克维修工程车(:artk Inaintenane。%26repair vehicle)装有坦克维修设备、仪器、工具的技术保障车辆。见坦克保养工程车、坦克修理工程车。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条