1) installation fundamental circle
安装基准圆
3) installation reference line
安装基准线
1.
21 mining district of Gaocheng Coal Mine and according to the actual changes of gradient,the installation reference line for belt conveyor can be timely adjusted,and so the sharp straight line changes of the belt gradient can be turned into the slow curve changes,thus realizing safe,reasonable and fast installation of belt conveyor.
针对告成煤矿21采区皮带下山巷道起伏情况,按实际坡度变化及时调整带式输送机安装基准线,使胶带坡度由剧烈的直线变化转化为缓慢的曲线变化,达到安全、合理、快速安装带式输送机的目的。
4) erection of reference plane
安装基准面
5) wheel mount reference
车轮安装基准
6) installation code
安装标准
1.
The effectiveness and the installation codes are clarified by calculation.
通过计算明确了等电位联结的有效性和安装标准,并结合目前国际上流行的等电位联结方式——法拉第笼,指出进行等电位联结时容易出现的错误和预防措施,供设计者参考。
补充资料:设备的安装——设置安装基准
设备的安装——设置安装基准 | ||
|
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条