说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 工场施工图
1)  workshop drawing
工场施工图
2)  construction site
施工现场
1.
Discussion of fire-fighting safety management on buildings construction site;
谈建筑施工现场消防安全管理
2.
Major questions existed in safety management of construction site at present and countermeasures;
当前施工现场安全存在的主要问题及对策
3)  Site construction
现场施工
1.
Study on the technology of the cement mixing pile composite foundation and the site construction management;
水泥搅拌桩复合地基技术及现场施工管理探讨
2.
Taking the construction of HengNan Bridge of Hengyang City in Hunan Province as an example, the paper states the main construction point and control method in the course of the site construction of steel pipe concrete arch bridge.
以湖南衡阳市衡南桥施工为实例 ,说明钢管混凝土拱桥现场施工过程中主要阶段的施工要点及控制方法。
4)  field construction
现场施工
1.
Field construction management is a kind of comprehensive work with high technical requirements,this management is also a process of convertion from planning and designing to reality.
现场施工管理是一项技术性较强的综合性管理工作,是一个将规划设计意图转换为实际的过程。
2.
Actually, hydraulic fracture technology has now matured at abroad and home, but the approach of quality control over the field construction of technology needs further perfecting.
在国内外,水力压裂工艺目前已经非常成熟,但工艺现场施工这个环节的质量控制手段还有待进一步的完善。
5)  construction field
施工现场
1.
Discussion on the safety status in construction field and corresponding measures;
浅析施工现场安全现状及应对措施
2.
Visual monitoring systems for 500 kV substation construction fields;
500kV变电站施工现场视频监控系统方案研究
3.
Cultivation and organization of the material management talents procession in the construction field;
施工现场材料管理人才队伍的培养和组织
6)  construction site
施工场地
1.
Creation of environment-friendly construction site for Dalong Water Control Project;
大隆水利枢纽工程环境友好施工场地的创建
2.
Secondary ploughing of construction site in Yanmenguan Tunnel engineering;
雁门关隧道施工场地复耕工艺
3.
Taking Huozhou Power Plant as the example, this paper introduces that how the thermal power plant should do the reasonal layout in the construction site and do the reasonal organization to the construction process.
以霍州发电厂为例,介绍了火力发电厂在施工期间应如何对施工场地进行合理布置及对施工工序进行合理组织。
补充资料:烟囱施工


烟囱施工
chimney construction

  要点是:滑模设施设里在底部已浇筑好的烟囱筒座上,即沿筒壁周围按需要均匀埋设足够数量的支承爬杆(圆钢),每根支承杆上装设一个爬升式液压千斤顶,藉以支撑门架及操作平台,千斤顶由统一的液压系统控制同步动作,平稳爬升,内外模板固定在门架上,随之一起滑升。其结构见图1。爬升式液压千斤顶有上下两 ┌─┐ │ │┌─┼─┘│ │ └─┘ 图1滑模施工装!示意图1一筒壁沼一支承杆门一千斤顶雌一操作平台卢一门架,6一模板口一吊笼;8一扒杆个卡头,上升时,上卡头卡紧支承杆受力,下卡头松开.千斤顶上升带动门架及操作平台上升一个行程,一般为20一30 em,此时,下卡头随同一起上升;下一个动作是,下卡头卡紧支承杆,上卡头松开,千斤顶活塞上升一个行程,上卡头随之上升,完成一个循环。混凝土由吊笼运送,钢筋等长料用设置于平台上的扒杆吊运.混凝土脱模时强度不低于。.2MPa。安排得当,一般都可以连续作业。在筒身增高时,支承杆也跟着接高。模板由固定模板、抽拔模板和收分模板三种组合而成,施工中随烟囱直径的逐步变小,操作平台的直径随着收小,门架需相应向筒心内移(调径),模板也要不断收分。当收分模板与抽拔模板相碰时,抽除一块抽拔模板,按此直至筒顶。滑模施工中要经常进行中心线测量,检查各千斤顶的升差和烟囱垂直度偏差,随时进行调整。垂直度测量可用激光准直仪测量。 滑模施工可分单滑、双滑及内砌外滑三种。单滑是仅对筒身混凝土进行滑模施工,待筒身混凝土全部完成后,在筒内另设升降平台,自下而上砌筑内衬体。双滑是同时进行筒身混凝土和内衬混凝土的浇筑,外壁和内衬之间设有隔热层,隔热层多用水泥珍珠岩板,内衬多为较能耐腐蚀的陶粒混凝土等。内砌外滑是筒身滑升时,仅设外侧单面模板,内模靠超前施工的内衬体代替模板。通常内衬用陶粒混凝土预制块或耐火砖或红砖,并用耐腐蚀砂浆砌筑。 升模法主要特点是:提升时,模板与筒壁脱开,模板与混凝土不再存在互相依存、互相摩擦的滑动问题。操作架及模板等施工设施,通过对销螺栓固定在下方具有一定强度的简壁上。提升时将对销螺栓拔出,将该孔用砂浆封堵。该法有用人工提模和电动提模两种。 钥烟自施工自立式烟囱可在现场组合,用起重机或倒落式扒杆进行整体竖立就位。塔架式烟囱的下面部分可用起重机对塔架和烟囱分段交叉吊装,上面部分塔架可在已装塔架上立扒杆散件吊装,再利用塔架吊装烟囱。 恋筒多,式烟自施工外筒身的施工与一般烟囱相同。当内排烟管为砌体时,有随外筒身同步砌筑的,也有在外筒到顶后分段砌筑的。当内管为钢质时,一般在外筒身完工后进行。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条