您的位置:首页 -> 词典 -> 监工计划制度
1)  supervision plan system
监工计划制度
2)  supervision plan
监工计划书
3)  plan of project schedule
工程进度计划
1.
According to the importance of examination organizing design by the supervising engineer,it introduces the common principle of examination,discusses examination s main content of construction organizing design from many aspects——the general schedule of construction,plan of project schedule and constructing plan,etc.
针对监理工程师审定施工组织设计的重要性,介绍了审查的一般原则,从施工部署总进度计划、工程进度计划、施工方案等方面论述了施工组织设计的审查主要内容,以保证今后施工的顺利进行。
4)  construction schedule
施工进度计划
1.
Comparing with the traditional theory, this paper bears two new frames of reference in planning the construction schedule.
与传统理论相比,本文在编制施工进度计划时有两个方面的突破:一是通过施工项目的工艺流程分析,来确定施工项目在线路的持续时间;二是通过施工预算来确定工程总用工。
2.
This paper expounds the common forms and procedures of the construction schedule, and introduces the compilingprocedures and methods for the programme ofpreparatoryworks and the resources requirement plan.
阐述了施工进度计划的常用形式、步骤,介绍了施工准备工作计划以及资源需要量计划的编制过程和方法。
3.
From the point of view of supervion,this paper anticipates the rationalization and stabilization of construction schedule provided by contractor in construction preparatory stage, and the consequences caused by an accident, then gives some advises to solve.
围绕这一问题 ,从监理单位的角度对施工准备期承包商提交的施工进度计划的合理性、预测施工进度计划的稳定性 ,以及意外事件发生的可能后果进行探讨 ,并提出相应的处理措
5)  Construction schedule plan
施工进度计划
1.
In order to prepare and optimize construction schedule plan,the calculation of earliest start time,latest start time,earliest finish time,latest finish time,total float and free float of the project′s works is very important.
为了编制和优化施工进度计划,计算构成施工项目的各项工作最早开始时间、最迟开始时间、最早完成时间、最迟完成时间、总时差和自由时差等时间参数十分重要。
2.
Construction schedule plan management refers to the establishment,the implementation and the supervision of construction schedule plan.
施工进度计划是施工单位进行生产的重要依据,也是采购材料和用工计划等经济活动的参考依据,它从施工单位取得建设单位提供的设计图纸进行施工准备开始,直到工程竣工投产交付使用为止。
6)  overall construction schedule
施工总进度计划
1.
This paper discusses the optimum method of overall construction schedule in the view of systematization and analyszes the factors concerned with overall schedule.
本文从系统观点出发,首先对影响施工总进度计划的有关因素进行了分析,建立了以系统总体经济效益最好(即施工总费用最少)为目标的施工总进度计划优化数学模型,并提出了解此模型的计算机方法,通过算例求解介绍了使用该程序的具体步骤。