说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 沙井施工表
1)  manhole schedule
沙井施工表
2)  kick control work sheet
井控施工表
3)  vertical shaft construction
立井施工
1.
This paper introduces the technology and application of synchronous concentrated control of several steady vehicles in vertical shaft construction, which has solved the dissynchromous consentrated control problem of steady vehicles and achieved great effect in vertical shaft construction.
本文介绍了立井施工中多台稳车同步集中控制技术及其应用,解决了稳车不能同步集中控制的问题,在立井井筒施工方面取得了良好的效果。
2.
Taking the vertical shaft construction of Qianfogou Coal Mine as the example, this paper introduces in detail the technology of slide template, and puts forward some matters needing attention in the construction.
以千佛沟矿排矸立井施工为例,详细介绍了滑动模板筑壁的工艺,提出了施工中的注意事项。
4)  open caisson construction
沉井施工
1.
Calculation and analysis of open caisson construction of pumping station for Yuhuan Power Plant;
玉环电厂雨水泵房沉井施工计算和分析
2.
Application of thixotropic slurry to open caisson construction;
触变泥浆在沉井施工中的应用
3.
On the application of the pile block injected reinforcement in the open caisson construction;
浅谈桩顶注浆加固在沉井施工中的应用
5)  shaft construction
井筒施工
1.
By the construction practice of pre-reserved beam sump in the shaft construction of Guqiao Coal Mine,goes further into the technical factors and pre-reserved result ect.
通过顾桥矿井筒施工过程中预留梁窝的施工实践,探讨了井筒掘砌中预留梁窝施工的技术因素、预留效果等。
6)  drilling operation
钻井施工
1.
Development and application of downhole hole-closure device in the overall process of underbalanced drilling operation;
用于全过程欠平衡钻井施工的井下封井器
补充资料:立井
      见矿山井巷。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条