1) concreting
[英]['kɔnkri:t] [美]['kɑnkrit]
浇灌混凝土;浇筑混凝土
3) poured concrete
灌浇混凝土
4) Concrete placement
混凝土浇筑
1.
The key point of concrete construction in Cihe invert siphon project are the vertical transportation of pipeline concrete placement and the construc tion of moid plate procesa Through comparing with similar engineering and analyzing the real situation, the vertical transportation and mold plate construc- tion are determined after systematic verificatioa.
磁河倒虹吸工程混凝土施工的关键点在于管身段混凝土浇筑的垂直运输及模板工艺的施工。
2.
How to prevent and handle the aggregate segregation should be a key to insure the quality of concrete placement.
三峡二期厂坝混凝土采用塔带机入仓浇筑,具有入仓强度高,覆盖面积大,连续均匀布料等优点;但混凝土通过100~400 m的供料线和塔带机运至仓面,混凝土骨料分离现象难于避免;如何预防与处理混凝土骨科分离是保证大坝混凝土浇筑质量的关键。
5) concrete casting
混凝土浇筑
1.
According to the characteristic of the construction technology of special-shaped underground continuous wall,this article elaborated each step from construction preparation,survey,dredging,erection of reinforcement cage,concrete casting to wall forming,further briefly introduced the quality control measures and emergency treatment methods.
本文根据异型地下连续墙施工技术的特点,并结合工程实例,对施工准备、测量、挖槽、钢筋笼吊装、混凝土浇筑到成墙各个施工步骤进行了详细阐述,对施工中的质量控制措施和应急处理措施作了扼要介绍。
2.
This paper introduces the application situation and application results of MNC-A3 high-performance early strengthening agent in concrete casting works of a certain housing estate.
介绍了MNC-A3高效早强剂在某小区混凝土浇筑工程中的应用状况及应用效果。
3.
Based on the analysis results,the main issues in the design and construction were studied,such as structure style choice,joint design,concrete casting and so on.
本文结合工程实例,简要论述钢管混凝土张弦结构的设计过程,通过对比分析对设计和施工过程中的关键问题,如结构选型、节点连接、混凝土浇筑等进行了较为深入地论述,最终得到了一些有益的结论。
6) concrete pouring
混凝土浇筑
1.
The arithmetic of 2D column drawing and 3D perspective drawing of the concrete pouring for arch dam are studied in this paper.
研究了拱坝混凝土浇筑的二维柱状图和三维透视图的算法,以及混凝土浇筑的计算机图形处理,通过对拱坝混凝土浇注的计算机模拟,动态地描述拱坝混凝土施工进程。
2.
Key points of construction technology are emphasized in this text,such as sorting out of beam characteristic parameter,desigh and operating technology of pedestal and formwork,concrete pouring,pre-tension and post-tension construction,etc.
该文结合大型预应力箱梁工厂化预制施工中的实践经验,针对该类构件预制施工中的主要难点进行了分析总结,重点介绍了梁型特征参数翻样、生产台座和模板的设计及操作工艺、混凝土浇筑、先后张预应力施工等关键技术。
3.
In this article,the author introduces some technologies used in Tanghe inverted siphon body construction,such as formwork technology,steel bar connection technology,water stop strap installation technology,construction joints settlement and concrete pouring method.
介绍唐河倒虹吸管身混凝土施工过程中的模板技术、钢筋连接新技术、止水带安装、施工缝留置及混凝土浇筑方法。
补充资料:混凝土浇灌
混凝土浇灌
concrete depositing
环绕壳体对称灌筑。扁壳结构的混凝土浇灌,应以四面横隔交角处为起点,分别对称地向中央和壳顶推进,直到四角的三角形部分混凝土浇灌完毕,再按球形薄壳结构混凝土浇灌方法进行顶部混凝土的浇灌。 筒壁结构浇灌圆形、方形的独立筒壁结构的混凝土应分层交圈浇灌,分层高度不超过40cm。大型有隔墙的筒壁结构的混凝土,当每层不能保证在初凝以前连续浇灌时,可分区进行,但施工缝部位要选择适当,支设的模板应使缝面保持垂直。筒壁混凝土灌筑至筒顶梁底标高时暂停,再与筒顶梁与顶板混凝土一起连续浇灌。 混凝土振捣混凝土的浇灌质量,在很大程度上取决于混凝土振捣作业。混凝土振捣时,一般要求插捣要均匀;振动器的每次移动距离应不大于作用半径的15倍;每点振捣的时间以混凝土表面泛出灰浆为准,过分振捣会使砂浆上浮形成分层;应避免振捣器与钢筋、模板及其他埋设物相碰撞。振动器分内部振动器、表面振动器、外部振动器三种。内部振动器又称插入式振动器,其振动部分有锤式、棒式、片式,振动频率为60。。~2。。。OHz,适用于大体积混凝土以及基础、柱、梁及厚板的混凝土振捣。操作要领是“快插慢拔”。混凝土分层浇灌时,每层厚度应不超过振动棒长度的1.25倍,振动上层时应将振动器插入下层scm左右,以增强层间结合。表面振动器又称平板式振动器,适用于平板、地面、屋面等混凝土的振捣。外部振动器又称附着式振动器,用螺栓或夹具等固定在模板外侧,以间接传递振动力振捣混凝土。 (钱钓达)hunn一ngtuJ旧oguan混凝土浇灌(eonerete depositing)按制定的作业设计,把混凝土拌合物填筑到工程部位的施工工艺。浇灌混凝土前要根据工程类型、浇灌数量,安排拌合物的布运路线和机具,确定劳动组织,制定浇灌方案;对已支设安装完毕的模板、钢筋、预埋件等的位置、数量进行慎重检查并做好记录;清理浇筑区域的杂屑、锈污、积水等,补塞缝隙孔洞,并检查合格。 基础浇灌台阶式柱基混凝土可按台阶分层,先边角后中间,连续灌筑,不得留施工缝。浇灌时要采取措施防止上下台阶垂直交角处的泥落脱空。成排柱基混凝土宜采用流水作业,先顺序浇灌各个柱基的第一级台阶,待沉实后,再依次灌筑第二级台阶,但必须保证在初凝以前的连续施工。条形基础混凝土宜按深度分段分层连续灌筑,各段层间应互相衔接,并呈阶梯状向前推进。大块体基础的混凝土应分层浇灌,分层捣实,上下层不得形成施工缝,分层厚度一般为30~40cm,面积特大的基础混凝土可分格间隔浇灌,以免产生收缩裂缝,但应注意施工缝的处理。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条