说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 不良地质情况
1)  adverse geological condition
不良地质情况
2)  unfavorable geographical condition
不利地质情况
1.
The unfavorable geographical conditions such as high water level,sludge and shifting sands,hard piling down to the underground rock will have a strong impact on the normal construction of the manual-excavated pile.
人工挖孔灌注桩施工,经常会遇到高水位、淤泥、流砂及无法嵌岩等不利地质情况,严重影响施工正常进行。
3)  geologic condition
地质情况
1.
The geologic condition of the bearing layer was probed with GPR to ensure the safety and high quality of pile foundation construction.
佑溪大桥#5桩位地形复杂,为确保桩基础的施工安全和施工质量,采用地质雷达对#5桩的持力层进行探测,探明了持力层的地质情况。
4)  geological condition
地质情况
1.
Combined with foundation pit supporting engineering of coal transport system in one power plant the geological conditions of underground passageway are discussed.
对某电厂工程输煤系统通廊基坑支护工程的具体情况进行了介绍,探讨了输煤系统地段的地质情况,对该工程地下通廊基坑钢板桩支护进行了验算,以保证基坑工程施工安全,从而保证施工顺利进行。
2.
It introduces the red clay,points out the red clay foundation is one good foundation in the civil construction project,and brings forward the corresponding measures solving the problems in the geological conditions of crack,ground burrow and clint in the red clay foundation projects,which will supply reference to the red clay foundation projects.
对红粘土进行了介绍,指出了红粘土地基是土木建筑工程中的良好地基,针对红粘土地基工程中经常出现的裂隙、土洞、石芽等复杂地质情况,提出了一些解决此类问题的措施,以供红粘土地基工程参考借鉴。
3.
Discussion was made with engineering cases on how to choose pile-driving machine in large diameter bored cast-in-place pile construction in different geological conditions,so as to increase construction efficiency.
结合工程实例,讨论了在大口径钻孔灌注桩施工中,如何针对具体地质情况选择不同的桩机的问题,从而提高施工效率。
5)  in [out of] kilter
情况良好[不好]
6)  unfavorable geological condition
不良地质
1.
According to the unfavorable geological conditions in Wuqiaoling, from landslide, dangerous rock and other aspects the difficulties in expanding planning caused by geological issues are analyzed; at the same time corresponding treatment measures are proposed according to the anticipated environmental geological problems in double line engineering.
针对乌鞘岭地段不良地质的分布情况 ,从滑坡、顺层斜坡、崩塌落石等方面 ,分析了该地质情况对展线工程的影响 ,提出二线修建后可能引起的环境地质问题的处理方
2.
The paper summarizes the engineering geologic and hydrogeologic condition along the Shanghai Chongming Tunnel and analyses the unfavorable geological condition and its solution in the site.
对上海崇明越江隧道工程沿线的工程地质和水文地质条件进行概略总结,并对场地内的不良地质及其对策进行了分析评价。
3.
The unfavorable geological conditions around and in front of the working face in tunnel engineering will cause collapse of tunnel and surge of underground water resulting in tremendous causalities and equipment damage.
隧道掌子面前方和周围的不良地质条件极易引起隧道塌方、涌水,导致人员伤亡、设备毁坏、工期延误,造成重大损失,因此需要采取合理的超前地质预报方法对可能发生地质灾害进行预报。
补充资料:不利
1.有害;没有好处。 2.不顺利;不能取胜。 3.不锋利。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条