1) straight forward operation
流水作业,笔直向前作业
2) straight flow production line
直线流水作业线
3) flow shop
流水作业
1.
Research on the combination of inspection facilities for flow shop quality inspection;
一类流水作业质量检验中检验设备组合问题的研究
2.
Combination of machines for flow shop quality inspection
一类流水作业质量检验中机床组合问题
3.
An approximation algorithm for the problem of flow shop with a transportation turntable is presented in this paper.
对于带有转盘的流水作业问题T1,本文给出了一个近似算法,并侧重论证算法性能比的精确值。
4) flow process
流水作业
1.
The problems in the cast in place beam and plate construction with large span and large area are solved by adopting secondary grouting, side feeding and step flow process.
从力学原理对多层框架结构现浇梁板施工方法及工艺进行了探讨 ,采用混凝土二次浇灌、混凝土侧下料、分段流水作业解决了大跨度、大面积现浇梁板施工中诸多弊端。
2.
For two-machine flow process problem, each job has a setup-time before it is processed, the setup step of the same job can be overlapped on two-machine, but the processing step can t.
在两机器流水作业问题中 ,每个工件在加工前有一调整时间 ,同一工件的调整是可以重叠的 ,但加工时间不能重叠 。
5) flow-shop
[英][fləuʃɔp] [美][floʃɑp]
流水作业
1.
Computational complexity of the makespan of the three-stage flow-shop with some batch machines;
含有批处理机的三机流水作业加工总长问题的计算复杂性
2.
In this paper, we investigate the computational complexity of the makespan of the three-stage flow-shop with some batch machines in some cases.
本文研究含有批处理机的三台机器流水作业加工总长问题在某些情形下的计算复杂性。
3.
For the lot-streaming problem in multi-stage flow-shop,the majority of the research in the past used to fix the number of the batches and find only the optimal batch sizes without consideration the setup time:In this paper,however,Setup time for the machines is introduced.
多台机器流水作业的 Lot-streaming问题(简称LS),以往的研究都不考虑调整时间,固定分批数,寻找最优分批大小;本文对机器引入调整时间,研究同时决定最优分批数及分批大小,并给出了相应最优算法。
6) flowshop
流水作业
1.
A new two machine flowshop scheduling problem with setup time and group technology.;
流水作业两台机器的成组排序的一个新问题
2.
The maximum tardiness in three-machine flowshop problem with separated setup,processing and removal time is discussed,where the setup time and removal time steps of the same job can overlap on three machines,but the processing time can not.
以最小化最大延误为目标函数,讨论了三台机器的流水作业问题,其中每个工件的操作由"调整"步、"加工"步以及"移走"步组成,而工件的调整和移走时间都与加工时间相分离,同一个工件的"调整"步和"移走"步在三台机器上可以重叠,但"加工"步不能重叠,并且第一台机器上没有空闲时间,工件一旦开始加工就不允许中断。
3.
In this paper,we discuss the total tardiness in two-machines flowshop problem with setup and removal time separated,where setup step and removal step of the same job is overlap on two machine,but the processing step can not be,and there is not idleness on the machine M_1.
讨论了一类两机器流水作业的总延误问题,其中每个工件的操作由“调整”步、“加工”步及“移走”步组成,而工件的调整时间和移走时间均独立于加工时间,同一工件的“调整”步及“移走”步在2台机器上可重叠进行,但“加工”步不能重叠,并且第一台机器上没有空闲时间,工件一旦开始加工就不允许中断。
补充资料:流水作业
一种生产组织方式,把整个的加工过程分成若干不同的工序,按照顺序像流水似地不断进行。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条