说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 高堤铲切
1)  high bank cut
高堤铲切
2)  root cutting shovel
切根铲
1.
Based on the theory analysis and the tests of working resistance of root cutting shovel,the authors gained the level of main technological parameters of root cutting shovel;the authors also studied on the arrangement of raking film tooth,the results indicated that the array of raking f.
对切根铲工作阻力进行了理论分析,并通过试验获得主要技术参数;同时,搂膜齿排列试验结果表明,搂膜齿的排列方式对搂膜率有一定的影响,最后一排的齿密度越大效果越好,但排列过密容易壅土,齿间距最小约为110 mm;通过综合试验,确定了悬挂式棉秆粉碎还田搂膜机的主要技术参数的较优水平组合;切根铲工作深度H为4~5 cm、提升角(或碎土角)β为16°、机具前进速度V为6。
3)  excavator shovel
切土铲
1.
The finite element analysis of the excavator shovel is done by using software Pro/E and FEA software ANSYS,for the reason some sections of the excavator shovel are broken when it works,the calculation results show the stress and distortion in the excavator shovel.
在使用中发现树木移栽机的主要工作部件切土铲会发生局部断裂的现象。
4)  high embankment
高路堤
1.
Study of settlement deformation prediction model of high embankment;
高路堤沉降变形预测模型研究
2.
Design on reinforced earth retaining wall used for high embankment of mountainous area highway;
山区高速公路高路堤加筋土挡土墙的设计
3.
On the design of changing high embankment to bridge in highway soft foundation section and its construction control;
浅谈公路软基段高路堤改桥设计与施工控制
5)  wave height at front of embankment
堤前波高
1.
Based on a large number of laboratory tests,deeply analysing on the relationship of between standing wave pressure and wave height at front of embankment and that compared with classical equation,used wave height at front of embankment as controlling parameter is reliability when wave is incident forward to the embankment.
通过大量的室内试验,深入研究了波浪正向入射时,立波压力与堤前波高的关系,并与各家公式进行对比,证明堤前波高作为控制参数的可靠性。
6)  embankment height
路堤高度
1.
Several measures to reduce embankment height of Ku-Ku highway
库库高速公路降低路堤高度的几点措施
2.
Therefore, the reasonable density of transverse passage facilities should not only ensure the reduction of the embankment height of expressway,but also satisfy the demands of the production and living of the residents at the both sides of .
横向通道设施尤其是下穿通道的数量会影响到整条高速公路平均填土高度的高低,因此合理的横向通道设施设置密度要既能保证高等级公路路堤高度的降低,又能满足两侧居民的生产生活需求。
3.
This paper uses a dedicated finite element software PLAXIS for geo-engineering,to further explore the rules of embankment settlement deformation under different heights,and discusses relationship between embankment height and road bed settlement deformation.
采用岩土工程专用有限元软件PLAXIS,对不同高度条件下的路堤沉降变形规律进行深入研究,探讨路堤高度与路基沉降变形的关系。
补充资料:根萝卜根尖纵切




根  萝卜根尖纵切  
                                     李正理提供
  [图]图

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条