The authors have put forword an idea of that the planning optimization scheme on elevation control of drainage pipelines in coastal plain,such as plastic sewers & core mould vibration-reinforced concrete rain-water pipes are applied,and sometimes a steel short pipe coated by special painting instead of sewer directly passes through a rectangular rain-water inspection well,etc.
提出了沿海平原排水管道高程控制规划优化方案,诸如采用塑料污水管和芯模振动钢筋混凝土雨水管,有时利用涂特种漆钢短管代替塑料污水管直接穿越一座矩形雨水检查井等,其内容可供同行参考。