说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 最初谈判权(初谈权)
1)  INRs (Initial Negotiating Rights)
最初谈判权(初谈权)
2)  negotiation authority
谈判权限
3)  negotiation authorities
谈判权
4)  negotiation right
劳资谈判权
1.
This paper focuses on the power struggle between labor and capital of NBA, after close study, it researched that the power struggle between labor and capital of NBA is directed against negotiation right, residual rights of control and residual rights of claim.
立足于NBA劳资双方的权力斗争实际,研究得出劳资双方的权力斗争分别从谈判权、剩余控制权和剩余索取权三个方面展开;其次,提示了上述三项权力斗争的内在联系,即劳资谈判权是剩余控制权和索取斗争的前提,而剩余控制权的分割和索取权的分配是劳资谈判权斗争的目的;最后,以时间为序,分别阐述了NBA劳资双方对上述三项权力斗争的发展历程和具体内容。
5)  right to collective bargaining
集体谈判权
1.
The core of the "Three Labor Rights" is the right to collective bargaining, the aim of the right to organize and strike is collective bargaining.
以团结权、集体谈判权 和争议权为基础的集体劳动权利体系,构成了现代劳动法律的基础。
6)  bargaining control
谈判控制权
补充资料:《城市规划法》规定了城市规划管理哪些权限?

《城市规划法》对城市规划管理赋予了七种权限,即立项参与权、建设用地核定权、建设工程批准权、用地调整权、监督检查权、行政处罚权和复议裁决权。
(1)立项参与权。《城市规划法》第三十条规定:“城市规划区内建设工程的选址和布局必须符合城市规划。设计任务书报请批准时,必须附有城市规划行政主管部门的选址意见书。”规定了城市规划行政主管部门对设计任务书(计划)方面的参与权。
(2)建设用地核定权。《城市规划法》第三十一条规定:“由城市规划行政主管部门核定其(指建设用地)用地位置和界限,提供规划设计条件,核发建设用地许可证。”规定了城市规划行政主管部门对城市建设用地具有定性(使用性质)、定位(用地位置)、定界(用地界限)和定量(用地面积)的“四定权”。
(3)建设工程批准权。《城市规划法》第三十二条规定:“在城市规划区内新建、扩建和改建建筑物、构筑物、道路、管线和其他工程设施,必须持有关批准文件向城市规划行政主管部门提出申请,由城市规划行政主管部门根据城市规划提出的规划设计要求,核发建设工程规划许可证。”规定了城市规划行政主管部门对建设项目可以施工的批准权。
(4)用地调整权。《城市规划法》第三十四条规定:“任何单位和个人必须服从城市人民政府根据城市规划做作出的调整用地的决定。”实际上规定了城市规划行政主管部门具有对城市用地进行调整的调整权。
(5)监督检查权。《城市规划法》第三十七条规定:“城市规划行政主管部门有权对城市规划区内的建设工程是否符合规划要求进行检查。”第三十八条规定:“城市规划行政主管部门可以参加城市规划区内重要建设工程的竣工验收。”规定了城市规划行政主管部门对建设工程项目的监督与检查权。
(6)行政处罚权。《城市规划法》第四十条规定:“在城市规划区内,未取得建设工程规划许可证或者违反建设工程规划许可证的规定进行建设,严重影响城市规划的。由县级以上地方人民政府城市规划行政主管部门责令停止建设,限期拆除或者没收违法建筑物或者其他设施;影响城市规划,尚可改正的。由县级以上人民政府城市规划行政主管部门责令限期改正,并处罚款。”规定了城市规划行政主管部门具有行政处罚权。
(7)复议裁决权。《城市规划法》第四十二条规定:“当事人对行政处罚决定不服的,可以在接到处罚通知之日起十五日内,向做出处罚决定的机关的上一级机关申请复议。”规定了城市规划主管部门具有行政复议的复议裁决权。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条