1) UOF (unplanned outage factor)
非计划停运系数
2) POF (planned outage factor)
计划停运系数
3) unplanned outage
非计划停运
1.
Based on the analysis of unplanned outage of unit in Jiangsu electric power system for several years,finding out the main factors which affect the unplanned outage of unit,put forwarding the measures which can reduce the unplanned outage of unit,providing some methods to improve the reliability for generating unit in Jiangsu Electric power system.
对江苏电网近几年大机组非计划停运情况进行了分析,通过分析比较得到了影响大机组非计划停运的主要因素,提出了降低大机组非计划停运的措施,为江苏电网并网发电机组提高可靠性提供了依据。
2.
Unplanned outage is one of important benchmarking content,and boiler "four pipe" leakage is the main reason caused unplanned outage in thermal power plant at long time,which influences safety and stable operation of generation equipments seriously.
非计划停运是对标工作的重要内容之一,锅炉"四管"泄漏一直是造成火力发电厂非计划停运的主要原因之一,它严重影响着火力发电设备的安全稳定运行。
4) UOR (unplanned outage rate)
非计划停运率
5) Unplanned outage hours(UOH)
非计划停运小时
补充资料:上停
1.星相迷信之说,面部及身体各分为上﹑中﹑下三停。面部自发际到印堂为上停;身体以头为上停。见《麻衣相法全编.麻衣先生石室神异赋》注。此外,绘画及书法中亦有上停之说,上停犹言上部。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条