1) unit capacity
机组功率,机组容量,单位容量,单机容量
2) unit capacity
单位容量机组功率
4) unit power
单机功率,单机容量,单位功率
5) power per unit
单机功率,单机容量
6) unit capacity
单机容量
1.
The installed capacity of Three Gorges hydropower station should be increased up to 19200 MW with the number of unit of 24 and unit capacity of 800 MW for generating more electricity to cover pea.
按世界水电装机的发展趋势,三峡水电站应考虑30年后上游水电站群的补偿作用,而尽可能地扩大其装机容量,多发调峰电量;降低其设备利用小时数至4000h左右,单机容量应优选80万kW级,装机24台,总装机容量1920万kW,较论证方案多装152万kW。
2.
Base the fact that the domestic manufacturers have little experience in producing bulb generating units with unit capacity 57MW,this paper analyses detailedly the difficulties and risk in designing and manufacturing the generating unit with capacity 57MW for Qiaogong Power Station.
单机容量为57MW 的灯泡贯流式水轮发电机组,国内是否能够制造,设计制造的技术风险有多大。
补充资料:发电机组有效载荷容量
发电机组有效载荷容量
effective load carrying capability of generat-ing unit
fod一anj一Zu youxlao zal触rong}‘Ong发电机组有效狡荷容t(effeetive IOad。arry-ing eapability of generating unit)发电机组板定容量减去为保持系统风险度不变所需预留的备用容量后的值.用公式表示为 C~C一△天(1)式中G为发电机组有效载荷容t;C为发电机组额定容量;△尺为系统所需备用容量。就是当系统扩建一台新机组后,该机组所能承担的系统负荷须小于机组的额定容量,才能使系统相对备用容t不变,从而使系统风险度保持不变。 计算方法由容量模型的递推公式(见发电系统模型)可知,当系统中增加一台额定容t为C,强迫停运率为q的发电机组时,系统停运容t等于和大于X的累积概率变为 P(X)二P‘(X)(1一叮)+P‘(X一C)叮(2)式中尸,(X)是未追加机组时的泉积概率,尸(X)是追加以后的新值。由式(2)可知尸(X)>Pl(X).因此,在增加一台机组后当停运容t均为X时,系统的风险度增大了.为使系统风险度仍保持为尸‘(X)的值,必须增加系统的备用容量。设此备用容t由新机组容量C中扣出其值为△尺,则由式(2)可写出下面的关系式 尸(X+△尺)一尸,(X+△尺)(1一q)+尸‘ (X+△尺一C)叮二P‘(X)只考虑上式右端等式,并略去尸上的符号“‘”即得 P(X+△尺)(l一口)+P(X+△尺一C),=P(X)(3)要求得△尺的值,必须知道系统容t模型中尸(X)的解析表达式,但这是有困难的。为此,可利用指数曲线来局部地拟合尸(X)与X的函数关系(见发电系统风险特性系数),有 尸(x)一刀e一丢(4)式中m为系统风险特性系数;B为常数.将式(4)的关系应用于式(3)后,在等式两端取对数,经过简单运算可得 战=。In〔(1一。)+。e景〕 一mln[(1一。)+。e景](5) 将式(5)代人式(1),最后求得此新发电机组的有效载荷容t为 c’=c一从一e一m一n〔(l一。)+。e轰](6)由此可知,C.不仅与机组本身的强迫停运率q(见电力系统可幸性基本数据)有关,且与系统风险特性系统数m有关。不难证明,q越小或二越大,C。越接近C。 应用在长期电源发展规划中,应用机组有效载荷容量代替额定容量,可在保持系统风险度不变的判据下,确定合理的装机类型和进度,以适应系统负荷的增长。此外,应用等风险度法安排发电系统机组检修计划时,将机组有效载荷容量与负荷模型结合,可以求得优化的结果(见发电系统检修计划优化)。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条