1) predetermined camber
预先起的拱度
2) bulging height
起拱高度
1.
A regression equation indicating the relation between the fabric bulging height and weight, and between the fabric weight and compactness is derived from the test and analysis of the bulging height of heavy_weight silk fabrics conducted by self_made bulge tester, thus offering data support to the design of proper weight and compactness of the fabric for bulge proofness.
采用自制的起拱测试装置 ,对重磅真丝绸的起拱高度进行了测试和分析 ,得出了重磅真丝绸的起拱高度与织物重量 ,织物重量与织物紧度间的回归关系式 ,为重磅真丝绸抗起拱性的适合重量和紧度设计提供了数据支持。
3) reversed arch
起拱度
1.
Influence on reversed arch of creep in prestressed concrete beam is analyzed by combining with project under construction Jiepaiya bridge in the reach from Gucheng to Wudangshan of Xiangfan-Shiyan highway.
结合襄樊 -十堰高速公路谷城至武当山段在建的界牌垭高架桥 ,分析混凝土徐变对预应力混凝土桥梁起拱度的影响 ,并提出控制桥梁过度起拱的设计方法和施工措施 。
4) hogback
[英]['hɔgbæk] [美]['hɑg,bæk]
拱起的背
5) pre-camber
预拱度
1.
The application of bridge doctor in steel bridge supervising,measuring and calculating the pre-camber;
桥博在刚构桥监控量测计算预拱度中的应用
2.
Research on Concrete Creep and Application in Pre-camber of Bridge;
混凝土徐变与桥梁的预拱度设置研究
3.
Based on it, this paper build a FEM model to analyze the infulence of construction procedure on the pre-camber setting of this bridges .
福厦客运专线中亚城特大桥为大跨度预应力混凝土连续梁桥,以其为工程背景建立有限元模型,分析悬臂施工中影响预拱度的各项因素,通过合理的计算方法和理论分析确定了桥梁施工过程中在受力和变形方面的工作状态,为类似桥梁工程的施工控制分析提供了参考。
6) camber
[英]['kæmbə(r)] [美]['kæmbɚ]
预拱度
1.
Cast box beams camber design of Changfeng Bridge;
长风大桥现浇箱梁预拱度设置方法
2.
A study on setting parametric camber of large-span curved continuous rigid frame bridge
大跨曲线连续刚构桥预拱度的参数化研究
补充资料:泵安装高度
分子式:
CAS号:
性质: 指泵安装的基准面至被送液体液面的垂直距离。即泵基准面标高与被送液体液面标高之差。单位方m。为保证泵不产生汽蚀,能正常吸入和排出被送液体,吸上泵装置的泵,安装高度必须低于泵的最大吸上高度;灌注泵装置的泵,安装高度必须大于泵的最小静吸入压头。水泵的传统习惯,在计算时,规定吸上泵装置的泵安装高度数值为正值;灌注泵装置的泵安装高度数值为负值。
CAS号:
性质: 指泵安装的基准面至被送液体液面的垂直距离。即泵基准面标高与被送液体液面标高之差。单位方m。为保证泵不产生汽蚀,能正常吸入和排出被送液体,吸上泵装置的泵,安装高度必须低于泵的最大吸上高度;灌注泵装置的泵,安装高度必须大于泵的最小静吸入压头。水泵的传统习惯,在计算时,规定吸上泵装置的泵安装高度数值为正值;灌注泵装置的泵安装高度数值为负值。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。